说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 蓄水运行
1.
Investigation and Analysis for Fishery Environment of Jingjiang at the Downstream of the Yangtze River before and after the Three Gorges Reservior Hold Back;
三峡水库蓄水运行前后坝下重要渔业水域生态环境的调查分析
2.
Exploring and Practice on Sanmenxia Reservoir Operation Mode of "Storing Clear Water and Releasing the Muddy"
三门峡水库“蓄清排浑”运行探索与实践
3.
Analyzing and Discussing the Ecomomic Operation of the Pumped-Storage Power Station;
抽水蓄能电站经济运行的分析与探讨
4.
Operation Characteristic Analysis on Excitation System for Pumped Storage Unit
抽水蓄能机组励磁系统运行特点分析
5.
Operating Risk Analysis of the Storage Subsystem in the East Route Project of South-North Water Diversion
南水北调东线工程蓄水系统运行风险分析
6.
Influence of Running Water Level in Flood Season of Sanmenxia Reservoir to Altitude in Tongguan After Operation of Method of Storing Clear Water and Discharging Muddy Water
三门峡水库蓄清排浑运行以来汛期运行水位对潼关高程的影响
7.
Optimization of Operation of Pumped Storage Power Station in System and Calculation of Benefits;
抽水蓄能电站系统运行优化及其效益计算
8.
Research on Operation Simulation of Pumped-Storage Plant in Power System;
抽水蓄能电站在电力系统中运行模拟的研究
9.
Roles of pumped-storage energy in promoting development of recycled economy;
水电蓄能运行在促进和发展循环经济中的作用
10.
OPERATION OF DYNAMIC ICE THERMAL STORAGE SYSTEM WITHOUT PRE-HEATING
过冷水式动态冰蓄冷系统的无预热运行
11.
Design and Running of the Blocking Dregs Dam in Huizhou Pumped Storage Power Station
惠州抽水蓄能电站拦渣坝设计运行探讨
12.
The Operation Mode of the Regulating Reservoirs in Intake Areas of the Middle Route of the South-to-North Water Transfer Project
南水北调中线工程受水区调蓄水库运行方式研究
13.
The research results provide a base for further studying the operation law of pump storage power plant.
为进一步研究抽水蓄能电站的运行规律提供基础。
14.
Nuclear Power Plant and Pumped Storage Station Modelling and Coordinated Operation;
核电站与抽水蓄能电站的数学建模及联合运行研究
15.
Study on the Characteristics of Pumped-Storage Power and It s Influence to Jiangsu Power Grid;
江苏抽水蓄能电站的运行特性及其对电网影响的研究
16.
Optimal dispatching of pump-storage power station based on benefits analysis
基于效益分析的抽水蓄能电站运行工况优化调度
17.
Superiority and application of a combined water-source heat pump and ice storage air conditioning system
水源热泵与冰蓄冷空调系统联合运行的优越性及应用
18.
Study on four-step operational mode prototype debugging of TGP lock under impounded level 156 m in the finishing construction period
三峡船闸完建期156m蓄水位4级运行方式原型调试研究