说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 王家坝水文站
1.
Application of Microsoft Excel Software to Flood Frequency Analysis for Wangjiaba Station in Huaihe River Basin
电子表格在洪水频率分析中的应用——以淮河王家坝水文站年最大洪峰流量系列为例
2.
Stability Analysis Against Deep Sliding of the Dam Foundation of Two Dam Section for Xiangjiaba Hydropower Station;
向家坝水电站两个坝段坝基深层抗滑稳定分析
3.
Probe into the Hydrologic Data Compilation of Fenhe Second Dam Hydrologic Station
汾河二坝水文站水文资料整编的探讨
4.
Dam Body Filling Design by Stages for Concrete Face Rock-fill Dam of Hongjiadu Hydropower Station
洪家渡水电站面板堆石坝坝体填筑分期设计
5.
Sensitive Analysis of Temperature Control Mesures of the Concrete Dam for Xiangjiaba Hydropower Station;
向家坝水电站大坝混凝土温控措施敏感性分析
6.
Study on the Treatment Scheme of Soft Foundation for Shuinuijia Embankment Dam;
水牛家电站心墙土石坝坝基处理方案研究
7.
Investigation on stability against deep level sliding of Xiangjiaba hydrostation gravity dam
向家坝水电站重力坝深层抗滑稳定性研究
8.
Dam Partition Temperature Control for Left Bank of Xiangjiaba Hydropower Station
向家坝水电站左岸坝体分缝温度控制研究
9.
Installing Technique of A Style Tower Cable Crane for Xiangjiaba Hydropower Project
向家坝水电站A型塔架式缆机安装技术
10.
Studies on Embankment Matials Test and Compacting Test of Shui Niujia Power-station Embankment Dam Project;
水牛家水电站大坝工程施工期筑坝材料试验及碾压试验研究
11.
Study on Hydraulic Model Test of the Left Spillway in Miaojiaba Hydropower Station
苗家坝水电站左岸溢洪道水力模型试验研究
12.
Study of the Problem about Hydrogeochemisty of Jingpin Hydroelectric Power Station;
锦屏一级水电站坝区水文地球化学问题研究
13.
Analysis of the influence of Mengwa Flood Storage Area on Wangjiaba's water level and discharge
濛洼蓄洪区运用对王家坝水位及流量影响分析
14.
Simulation and Optimization on the Dam Construction Schemes of Xiangjiaba Hydropower Station;
向家坝水电站大坝浇筑施工方案仿真分析与优化设计
15.
Dynamic Three-Dimension Visual Simulation for Xiangjiaba Hydroplant Dam Concrete Construction;
向家坝水电站大坝施工动态三维可视化仿真研究
16.
Research on Tailrace System of Tunnel with Sloping Ceiling in Right Bank Underground Hydropower Station;
金沙江向家坝水电站右岸地下电站变顶高尾水系统研究
17.
MONITORING RESULT ANALYSIS OF ROCKMASS STABILITY AT THE LEFT ABUTMENT FOR LIJIAXIA HYDROPOWER STATION
李家峡水电站左坝肩岩体稳定监测成果分析
18.
Optimization and organization on excavation and construction of the left abutment of Hongjiadu Hydropower Station
洪家渡水电站左坝肩开挖施工优化与组织