说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 极小化总完工时间
1.
An Optimal Algorithm of Minimizing the Total Completion on Identical Machine Batching Scheduling Problem;
极小化总完工时间同型机分批排序问题的最优算法
2.
The problem of minimizing the total weighted completed time on single batch processing machine is studied.
讨论了单机分批排序问题中目标是极小化加权总完工时间的问题。
3.
With Learning Effect Minimizing the Total Weighted Completed Time on Batch Processing Machines;
带学习效应的极小化全总完工时间的分批排序问题
4.
Design and Analysis of Predictive Scheduling Algorithms for Minimizing Total Completion Time Problem;
最小化总完工时间预测调度算法的设计与分析
5.
Minimizing makespan on a batching machine with batch arrivals
极小化最大完工时间的批到达同时加工排序问题
6.
The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).
考虑并行批加工机上不同尺寸工件的调度问题;目标是极小化最大完工时间。
7.
I manage my time well, so that I can always get things done on time.
我极懂得分配时间,因此总能准时完成任务。
8.
I'll finish the job, no matter how long it takes.
不管花多少时间,我总要完成这项工作。
9.
On-line scheduling on a batch processing machine with unbounded batch size to minimize the delivery time
批量无限时极小化工件配送时间的单机在线算法
10.
The Parallel Batch Scheduling Problem with Family Jobs and Equal Processing Time to Minimize the Weighted Total Completion Time
加工时间相同的分族分批排序加权总完工时间问题
11.
Single Machine Scheduling Problem with Minimizing Weighted Completion Times with Resource Constrained;
资源有限的加权总完工时间单机排序问题
12.
A Semi-Online Algorithm for Solving the Single Machine Scheduling Problem to Minimize Total Weighted Completion Time with Discounted Factor
折扣加权总完工时间问题的半在线排序算法
13.
Minimizing Maximum Lateness On Batching Machine;
最大延迟时间的极小化分批排序问题
14.
He worked 12 hours a day, and sometimes 16 hours or more, throughout his life.
他一天的工作时间总超过十二小时,有时在十六小时以上,一生如此。
15.
It costs me about four solid hours to finish this job.
我化了整整四小时来完成这项工作。
16.
Furthermore, computers can make these calculations in a fraction of the time it would take even the most skilled human operator to came up with an answer.
此外,计算机完成这些运算的时间极短,只占一个即使最熟练的计算员所需时间的极小一部分。
17.
Minimizing the Maximum Deviation of Job Completion Time from Their Due Dates Based on a General Mode;
一个一般应交工时间模式下完工时间的最大离差最小问题
18.
An Unbounded Batch Scheduling Problem with Incompatbile Job Families to Minimize the Weighted Total Completion Time
一类无界的不相容工件族分批排序加权总完工时间问题