1.
Lead-Zinc Mineralization Characteristics and Exploration Potential of the Yadu-Mangdong Fault Belt in Northwestern Guizhou
黔西北垭都-蟒硐断裂带铅锌成矿地质特征及找矿潜力分析
2.
A Feasibility Study of Hubei Qingjiang Shui Bu Ya Hydro-hinge;
湖北清江水布垭水利枢纽可行性研究
3.
Variable economical factors in construction of Jiangya dam;
江垭大坝工程施工中变化的经济要素
4.
Study on Development of Eco-agricultural Tourism in Nanchong Mount Fengya
南充市凤垭山生态农业旅游开发研究
5.
Study on Collapse Mechanism in the Mayakou Tunnel
马垭口隧道塌方事故发生机理的研究
6.
The Microclimatic Characteristics in the Tanggula Pass on the Tibetan Plateau
青藏高原唐古拉垭口地区小气候特征
7.
Failure Mechanism of Muzhuping Landslide in Shuibuya Reservoir Area,Qingjiang River
清江水布垭库岸木竹坪滑坡失稳探讨
8.
Jiangya underground powerhouse has 33 chambers in different size.
江垭电站地下厂房洞室群共有大小洞室33个。
9.
Research on the key shotcrete technologies for the underground tunnel chambers of Shuibuya Project
水布垭地下洞室喷射混凝土的关键技术研究
10.
Monitoring and analysis of surrounding rock mass of underground powerhouse chambers of Jiangya Power Station
江垭电站地下厂房洞室围岩监测与分析
11.
the water in the north still empties into the Dadu River, namely, the present Nanya River.
以北之水仍然进入大渡河,即现今的南垭河.
12.
The Application of the Advance Geological Prediction and Forecast in the Engineering Construction of LiangFengya Tunnel
超前地质预报在凉风垭隧道工程中应用的探讨
13.
Displacement Back-analysis of Soil Parameters for Shui Bu Ya CFRD;
水布垭面板堆石坝土体参数的位移反演分析
14.
Discussions on Several Problems of Construction and Design of Jiangya RCC Dam;
江垭碾压砼坝设计与施工中若干问题的探讨
15.
A Toe Board Foundation Treatment of the High Concrete-Faced Rockfill Dam in SHUIBUYA;
水布垭高面板堆石坝趾板基础处理研究
16.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
17.
Construction Technology of Large Cross-Section Diversion Tunnel of Shuibuya Water Conservancy;
水布垭水利枢纽特大断面导流隧洞施工技术
18.
Earthwork Design for Cubic Meter of Earth and Stone in Qingjiang Rockfill Dam Construction;
清江水布垭面板堆石坝动态土石方平衡设计