说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 西线一期工程
1.
Water Pricing Research on the First Stage Project of the Western Route of the South-To-North Water Transfer;
南水北调西线一期工程水价初步研究
2.
The Primary Study of Concrete Gravity Dam Type Comparison in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Jike dam site
西线一期工程混凝土重力坝坝型比较初步研究——以纪柯坝址为例
3.
Impacts on river ecosystem of the dry river valley in the first stage of western line of South-to-North Water Transfer Scheme
南水北调西线一期工程对干旱河谷区河流生态系统影响初探
4.
Natural Eco-environment Comprehensive Assessment by Remote Sensing Technology in West Route Area of South-West Line Project
南水北调西线一期工程调水区生态环境质量遥感分析与综合评价
5.
The Study of Dam Type Comparison Between Concrete Faced Rock-Filled Dam and Embankment Dam with an Asphaltic Concrete Core in first Stage of the Western Route Water-Transfer Project--Dam type comparison at Renda dam site
西线一期工程混凝土面板坝与沥青心墙坝坝型比较研究——以仁达坝址为例
6.
The Study of Dam Type Comparison Between Concrete Arch Dam and Concrete Faced Rock-Filled Dam in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Reba dam site
西线一期工程混凝土拱坝与混凝土面板堆石坝坝型比较研究——以热巴坝址为例
7.
The Study of Dam Type Comparison between Concrete Faced Rock-Filled Dam and Embankment Dam with a Clay Core in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Zhaluo dam site
西线一期工程混凝土面板坝与黏土心墙坝坝型比较研究——以扎洛坝址为例
8.
Hazard assessment of landslide and collapse in first-stage project of west line for water-transfer from south to north
西线调水一期工程滑坡崩塌体灾害评价
9.
It was involved in the gazetting and land acquisition for Phase I of West Rail Project and the MTR Corporation's Tseung Kwan O Extension Project.
该组为九广铁路西部铁路第一期工程及地下铁路将军澳支线工程刊登宪报,并进行收地。
10.
On the United Front Work in the Period of Peaceful Liberation of Tibet;
论西藏和平解放时期的统一战线工作
11.
Throughout the year, the department advised on two new railway projects - the KCRC West Rail (Phase I) and the MTR Corporation's Tseung Kwan O Extension.
年来,该署一直有就九广铁路西铁(第一期)和地下铁路将军澳支线这两项新铁路工程提供意见。
12.
It is expected that the first phase of the project will be completed within half a year to provide coverage to trunk line streets and the West Lake scenic area.
工程的第一阶段将对交通干道和西湖景区提供无线网络覆盖,预期在半年内完成。
13.
Study on Source Pump Station Optimal Operation of the First-stage Project of Eastern Route of South-to-North Water Transfer;
南水北调东线一期工程源头泵站优化运行研究
14.
Water Supply Cost Sharing and Calculating of the First Stage Project of the Eastern Route of the South-to-North Water Transfer;
南水北调东线第一期工程供水成本分摊与核算
15.
Eco-hydrological regionalization for water receiving areas of Phase Ⅰ Project of Mid-route of South-to-North Water Transfer Project
南水北调中线一期工程受水区生态水文分区
16.
Discussing the Rubbish Repair on the First Stage Wanjiazhai Yellow River Diversion Project in Shanxi Province;
山西省万家寨引黄一期工程弃渣治理研究
17.
Construction of the West Rail Phase I has been authorised and will start before the end of this year.
西铁第一期工程已经获准进行,并会在今年年底动工。
18.
During the Tenth Five- Year Plan period (2001-2005), a large number of projects will be undertaken in the western region.
“十五”计划期间(2001—2005年),将有一大批工程在西部开工建设。