1.
THE ENDANGER AND PREVENTION AND CURE OF POISONOUS PLANTS ON THE MEA DOW IN GERMU IN QINGHAI PROVINCETY
青海格尔木地区草地有毒植物危害及防治
2.
Study on desertifcation dynamic change and prevention countermeasures in Geermu of Qinhai
青海格尔木沙漠化动态分析及防治对策研究
3.
The first section, from Beijing to Golmud in Qinghai Province, was completed in 1984.
1984年青藏铁路第一期工程-北京至青海格尔木段建成通车。
4.
Gelmu City Vegetable Development Conditions Analyzed;
青海省格尔木地区蔬菜发展状况分析
5.
Desertification Investigating and Monitoring with Remote Sensing in Ge Ermu City in Qinghai Province;
青海省格尔木地区土地荒漠化遥感调查与监测
6.
Ecological Effect of 330kV Transmission and Distribution in Qinghai Section of Lanzhou-Xining-Golmud Railway
330kV兰州-西宁-格尔木青海段输变电的生态影响
7.
In addition, the region has laid the 1,080-km Golmud (Qinghai Province)-Lhasa oil-transmitting pipeline, one having the highest altitude in the world.
建成总长1080公里、世界上海拔最高的格尔木至拉萨的青藏输油管道。
8.
Ceremonies heralding the beginning of the construction of the Qinghai-Tibet Highway were held simultaneously in Golmud, Qinghai Province, and Lhasa, capital of the Tibet Autonomous Region, on June 29.
举世瞩目的青藏铁路开工典礼6月29日在青海省格尔木市和西藏自治区首府拉萨市同时举行。
9.
Enlightenment of Qinghai-Tibet Railway from Germu to Lhasa in Business;
青藏铁路格尔木—拉萨段运营的启示
10.
Study on Water & Soil Conservation at Qinghai-Tibet Railway Geermu-Lasa Section;
青藏铁路格尔木至拉萨段水土保持研究
11.
The plague control and thinking on Qinghai-Tibet railway of Golmud City
格尔木市青藏铁路沿线鼠疫防治与思考
12.
Structural Framework and Coal Basin Tectonic Evolution in Muri Coalfield,Qinghai
青海木里煤田构造格局与煤盆地构造演化
13.
Study on Improving the Drilling Efficiency of the Hailar and Tamtsay Exploration Area
海拉尔—塔木察格探区提高钻井效率技术研究
14.
Relationships between different types of structural zones and hydrocarbons in Hailaer-Tamtsag Basin
海拉尔-塔木察格盆地构造带与油气关系
15.
Study on Status Quo and Control of Water and Soil Loss at Qinghai-Tibet Railway Geermu-Lasa Section;
青藏铁路格尔木至拉萨段水土流失现状及其控制研究
16.
Design and Research of Locomotive Routing and Locomotive Crew Working System of Golumd-Lhasa Section of Xining-Lhasa Railway;
青藏铁路格尔木至拉萨段机车交路、乘务制度设计研究
17.
Thoughts of the Management and Operation of “Germu-Lasa” Section of Qinghai Tibet Line After It Is Completed;
青藏铁路格尔木至拉萨段修建后运营管理的思考
18.
Research on the Determination of Outdoor Insulation Level for the Transmission Line in Gormu High Altitude Area;
格尔木盐湖地区高海拔输电线路外绝缘问题的研究