1.
Research on Construction Simulation and Optimization Analysis in Delivery Layout Stage of Jinping First-Level Hydropower Project;
锦屏一级水电工程分标规划阶段施工仿真与优化分析研究
2.
On tender document consultation for the first-cascade Jinping hydropower project;
锦屏一级水电站工程招标文件咨询的几点体会
3.
Study on Spatial Interpretation and Analysis for Geologic Information of Jinping First-level Hydropower Station;
锦屏一级水电站工程地质信息空间解译与分析研究
4.
Development Character of Pusiluo Debris Flow Gully in Jinping Hydropower Station and Its Negative Influence on Rpoject;
锦屏一级水电站普斯罗沟泥石流发育特征及其对工程危险性评价
5.
Discussion about Safe Production Construction Organization Measures at Jinping 1~(st) Stage Hydraulic Power Station
锦屏一级水电站安全生产的施工组织措施
6.
Presplit Blasting in Excavation of High Slope at Right Bank of Jinping I Hydropower Station
锦屏一级水电站大坝右岸高边坡预裂爆破施工
7.
Jinping first stage hydropower station right bank slope rock mass random anchor construction
锦屏一级水电站右岸边坡岩体随机锚索施工
8.
Study on Stability of Approach Channel Slope for Jinping I Hydropower Station
锦屏一级水电站引渠边坡稳定性研究
9.
Hydro-power Project of First Level in Pingnan, Fujian Province;
福建省屏南县后垄溪一级水电站工程
10.
Constructing top-quality Jinping project and promoting hydropower development of the Yalong River Basin
建设锦屏精品工程 促进流域水电开发
11.
Stability Evaluation of the Slope above the Top of the Dam on the Right Bank of Jinping I Hydropower
锦屏一级水电站右岸坝顶以上边坡施工期稳定性评价
12.
Analysis and Evaluation on Stability of Slope at Left Spandrel Groove of Jinping First Stage Hydropower Station in Construction
锦屏一级水电站左岸拱肩槽边坡施工期稳定性分析与评价
13.
Study on Construction Technology for Jiefanggou 2~# Cable Bridge at Jinping Level I Hydropower Station
锦屏一级水电站解放沟2号索道桥施工技术研究
14.
Construction of Anchor Cable with Large-angle Upward Hole in Tailrace Surge Tank of JinpingI Hydropower Station
锦屏一级电站尾水调压室大角度上仰孔锚索施工
15.
Numerical simulation of rockburst on the drain tunnel in the Jinping Second Level Hydropower Station
锦屏二级水电站施工排水洞岩爆数值模拟
16.
Research on Slope Stability of Intake Slope on Right Bank of Jinping Ⅰ Hydropower Station;
锦屏一级水电站右岸进水口边坡稳定性研究
17.
Study of the Problem about Hydrogeochemisty of Jingpin Hydroelectric Power Station;
锦屏一级水电站坝区水文地球化学问题研究
18.
Optimization of Construction Schemes of Diversion Tunnel in Jinping Second Cascade Hydropower Station
锦屏二级水电站导流隧洞施工方案优化