1.
Based on the deformation rating method, this paper discusses the study of deformation monitoring control indices for the Three Gorges Permanent Ship Lock Slope.
本文采用变形速率法,对三峡永久船闸变形监控指标进行探索。
2.
Study on the Numerical Simulation of Deformation Mechanism of Middle Frusta and Vertical Border Wall at TGP Permanent Shiplock;
三峡永久船闸中隔墩和闸室直立边墙变形机理的数值研究
3.
Excavation Displacement Analysis by Distinct Element Method in Three Gorges Project;
三峡永久船闸高边坡开挖变形的离散元法分析
4.
The Deformation Monitoring and Back Analysis of High Rock Slope of the Three Gorges Project Permanent Shiplock;
三峡工程永久船闸高边坡变形监测及反分析
5.
Monitoring of acoustic emission during rock deformation for high slope of the permanent shiplock structures of Three Gorges Project
三峡工程永久船闸高边坡岩体变形声发射监测
6.
Measurement and Analysis of Deformation of Huaiyin Secondary Ship Lock on Beijing-Hangzhou Canal in Its Overhauling
京杭运河淮阴二线船闸大修工程变形观测分析
7.
Safety Monitoring Renovation and Deformation Law Analysis for Gezhouba Third Ship Lock
葛洲坝3号船闸安全监测更新改造及变形规律初步分析
8.
Welding deformation of arc gates and control of primary dimensions
弧形闸门焊接变形及主要尺寸的控制
9.
The lock keeper closed the lock gate.
船闸管理员关上了闸门。
10.
Contract Variation and Claim Management of Zhuzhou Navigation-Power Junction s Lock Project;
株洲航电枢纽船闸工程合同变更与索赔管理
11.
Analysis of switching on with no load and pre-excitation of marine high-capacity transformer
船用大容量变压器空载合闸及预充磁分析
12.
Estimation and analysis on delays at busy waterway lock
繁忙船闸的船舶待闸时间分析与估算
13.
On the Deformation Repair of Mine Hoist Brake Disc
矿井提升机制动闸盘变形修复方法初探
14.
Analysis of pivot bolt breaking for water gate of Xinqiao ship lock
新桥船闸闸门支铰连接螺栓断裂分析
15.
Space Finite Analysis of Sector Lock Gate Structure;
船闸三角闸门结构的空间有限元分析
16.
filling and emptying system
(船闸的) 充水和放水系统
17.
lock filling and emptying system
船闸充水与泄水系统
18.
Our ship locked into the canal.
我们的船过闸驶入运河。