说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 电气主接线可靠性评估
1.
Study of Reliability Evaluation for Bus Configurations of Power Station and Substation;
发电厂、变电站电气主接线可靠性评估的研究
2.
Reliability and Economic Evaluation of the Bus Configuration of the Substation;
变电站电气主接线可靠性与经济性评估
3.
RESEARCH AND PRACTICE ON RELIABILITY EVALUATION OF POWER STATION BUS SYSTEMS ARRANGEMENT;
发电厂电气主接线可靠性研究与实践
4.
Research for Reliability Analysis of Bus Arrangement on 750kV Station;
750kV变电站电气主接线的可靠性分析研究
5.
Evaluation of the reliability and economy of the main lines of middle voltage power distributing network
中压配网主干线可靠性与经济性评估
6.
The Research of Reliability Management and On-Line Reliability Evaluation of Power System;
电力系统可靠性管理与在线可靠性评估的研究
7.
Model and Estimate of Electrical Connectors under Vibration Stress;
航天电连接器振动可靠性建模与评估
8.
Research and Implementation of Transmission Line Electric Reliability Evaluation System
输电线路电气可靠性预测与评估系统研究与实现
9.
Study on the Method of On-Line Distribution System Reliability Assessment;
配电系统可靠性在线评估方法的研究
10.
The reliability criterion of bus arrangement systems is power supply continuity.
变电所电气主接线可靠性判据应该是:供电连续性。
11.
Main Connection Reliability Analysis of Power Plant Base on FD Method
基于FD法发电厂主接线可靠性分析
12.
Research on the Reliability Evaluation Method of High Voltage Overhead Transmission Lines;
高压架空输电线路可靠性评估方法的研究
13.
The Reliability Evaluation of Relay Protection Service in Optical Cable Line
光缆线路中继电保护业务的可靠性评估
14.
The Evaluation on Electromigration Reliability of Copper Interconnect Structures with Extension
具有冗余设计的铜互连线电迁移可靠性评估
15.
Reliability Analysis of Traction Substation Main Wiring of Passenger Dedicated Railway
客运专线牵引变电所主接线可靠性分析
16.
Reliability Evaluation of DK77 Series WEDM Based on Fuzzy Comprehensive Evaluation
基于模糊综合评价的DK77系列电火花线切割机床可靠性评估
17.
Reliability Evaluation Based on Multipath Routing in WMN
基于多径路由的无线Mesh网可靠性评估
18.
Research on the Evaluation and Reliability Growth of Aerospace Electrical Connectors under Multi-ply Stress;
航天电连接器综合应力可靠性评估与增长的研究