1.
Test Research into the P.C. Continuous Curved Box Girder Bridge;
预应力混凝土连续弯箱梁桥试验研究
2.
Study on the Bending and Torsion Deformation of Continuous Prestressed Concrete Curved Box-Girder;
预应力混凝土连续弯箱梁桥弯扭变形的研究
3.
ANALYSIS OF CURVED CONTINUOUS BOX-GIRDER BRIDGES WITH VARIOUS PLATE THICKNESS BY DOUBLE SPLINE SUBDOMAIN METHOD
双样条子域法分析变截面连续弯箱梁桥
4.
Research about Lateral Displacement and Torsional Distortion of P.C. Continuous Curved Box Girder;
预应力混凝土连续弯箱梁的侧向位移研究
5.
Research on the Tensioning Sequence of the Steel Wires of P.C. Continuous Curved Box Girder;
连续弯箱梁桥预应力钢束张拉次序研究
6.
Mechanical Behaviors Analysis of the Prestressed Concrete Box Girder Bridge's Negative Moment Area
预应力混凝土连续箱梁负弯矩区力学性能的分析
7.
Study of indexes of continuous girders (double track line) erected with cast-in-place cantilever method;
悬浇连续箱梁(双线)梁部指标的研究
8.
DESIGN AND ANALYSIS OF PRESTRESSED CONTINUOUS CURVED BOX BEAM WITH SINGLE SUPPORT FOR CAIHUYING FLY-OVER IN WEST WING PROJECT OF BEIJING
北京市西厢工程菜户营立交独柱支承预应力弯箱连续梁桥设计与分析
9.
Analysis for Prestressing of Curved Continuous Box Girder Bridges
箱型截面曲线连续梁桥的预应力分析
10.
The Construction Craft at 0 #~1 # Node Section of Box Continuous Beam
箱形连续梁0~1~#节段施工工艺
11.
The linearis monitoring under skew continuous box girder bridges cast with balanced cantilever method
悬臂浇注斜交连续箱梁桥的线形监控
12.
Research on Designing Scheme for V-shaped Continuous Steel Box Girder Bridge in High-speed Railway;
高速铁路V形钢箱连续梁桥设计研究
13.
Construction Monitor of Large Span Continuous Box Girder;
大跨度连续箱梁桥施工监控技术研究
14.
Finite Element Analysis of Skewly-Supported Continuous Box Girder Bridge with Variable Section;
斜交变截面连续箱梁桥的有限单元法
15.
On Multipoints Jacking Construction of Zhujiang Bridge with 5 × 50 m Continuous Box Girder
珠江大桥5×50m连续箱梁多点顶推施工
16.
Concept and application of continuous box beam flange effective width
连续箱梁翼缘有效宽度的概念及应用
17.
Reinforcement of Prestressed Concrete Curved Box Girder Bridge
某预应力混凝土曲线连续箱梁桥加固
18.
Analysis on Common Problems in Closure Segment of Continuous Box Rigide-frame Bridge
连续箱梁刚构桥合龙段常见问题分析