1.
Attenuation of P,S and coda waves in Longtan reservoir region
龙滩水库地区P波、S波和尾波衰减
2.
Study on the Stability of BaDu Landslide after LongTan Reservoir Impoundment;
龙滩水库蓄水条件下的八渡滑坡稳定性研究
3.
Comparison and analysis of budgetary estimate unit price of reservoir submersion land compensation of Baise multi-purpose dam project with that of Longtan hydropower station
百色水库和龙滩水库淹没土地补偿概算单价比较
4.
Design and Realization of Spatial Analysis Applied Models of Hong Shui River Up-Basin "Long Tan Reservoir GIS";
红水河上游“龙滩水库GIS”空间分析应用模型的设计与实现
5.
STUDY ON THE CHARACTERISTICS OF FOCAL MECHANISMS OF RESERVOIR INDUCED EARTHQUAKES AND STRESS FIELD IN THE LONGTAN RESERVOIR AREA
龙滩库区水库地震震源机制及应力场特征
6.
Discussion on Favoring the People of Relocation by Aquatic Breeding in Luodian Reservoir of Longtan Hydropower Station;
龙滩水电站罗甸库区水产养殖反哺移民的探讨
7.
On Forestry Ecological Construction of Tian’e Reservoi Region in Guangxi Longtan Hydro Power Station
论广西龙滩水电站天峨库区的林业生态建设
8.
The reservoir of Longtan Hydropower Station will inundate some areas of Guizhou and Guangxi Provinces, with large inundation area and a lot of relocated people.
龙滩水电站水库淹没涉及贵州、广西两省区,淹没面积大、移民人数多。
9.
Application of 3S Techniques in the Type Monitoring of Longtan Reservoir s Land Utilization;
3S技术在龙滩水电站库区土地利用类型监测中的应用
10.
Prediction of the Economic Development for the Circumjacent Reservoir Region of the Longtan Hydropower Project Using Fuzzy Neural Network;
用模糊神经网络定量类比预测龙滩水电工程库周区经济
11.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
12.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
13.
Optimization of Protection Configuration for 10kV Station Transformers of Longtan Hydropower Station
龙滩水电站10kV厂用变保护的优化配置
14.
Modeling of 170MW Unit Governor System of Huanglongtan Hydropower Plant
黄龙滩水电厂170MW机组调速系统建模
15.
On construction quality control of the fifth contract section bridge on the Longtan reservoir area highway
龙滩库区公路5合同段桥梁施工质量控制
16.
Water temperature structure and influencing factors in Ertan Reservoir
二滩水库水温结构及其影响因素研究
17.
Study on the Turbine Operation of Ertan Hydropower Station Lowering Reservoir Water Level during Low Water Period
二滩水轮机枯水期降低水库水位运行研究
18.
Research on Technology of Increasing Dam Height on Sludge before Dam of Datankou Reservoir
大滩口水库坝前淤泥面加坝技术初探