说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 压裂施工
1.
Fracturing control method for deep volcanic rock gas reservoirs in Daqing exploration area
大庆探区深层火山岩气藏压裂施工控制
2.
The fracturing base fluid confected on the best condition applied in spot fracture construction has attained best effect, and altered the oil floor.
优化条件配制的压裂基液投入现场压裂施工应用后,效果显著,达到了对油层改造的目的。
3.
RESEARCH ON MANMADE FRACTURE BREAK REGULARS AND TREATMENT COUNTERMEASURES IN FRACTURED HORIZONTAL WELL
压裂水平井人工裂缝起裂规律与施工对策
4.
Construction Quality Control of Precracking Technology for Semi-rigid Base
半刚性基层预压裂技术施工质量控制
5.
Working Method of Handling Water Conservancy Spillway Crack by Grouting with Pressure;
使用压力灌浆处理溢洪道裂缝的施工方法
6.
Construction technology of crack controlling for Autoclaved Aerated Concrete blocks wall
蒸压加气混凝土砌块墙体裂缝控制施工技术
7.
STUDY OF PREDICTION OF FRACTURING PARAMETER BY BP NEURAL NETWORK
BP神经网络预测压裂井施工参数的研究
8.
Conductor Tension Stringing Construction Technology of Eight-Bundle for 1000 kV EHV Transmission Line
1000kV特高压线路八分裂导线张力放线施工技术
9.
Thermal Stress Simulation Analysis during Construction Period and Temperature Control Measures for Crack Prevention Studies on RCC Gravity Dam;
碾压混凝土重力坝施工期温度应力仿真及温控防裂措施研究
10.
The Research into Volcanic Rock Fracturing Design and Construction System Based on Time Series Similarity Method
基于TS相似性方法的火山岩压裂设计施工系统研究
11.
The Preventive and Treatment Technique for Cracks of Autoclaved Concrete Building Blocks Wall
台山核电南生活区蒸压加气混凝土砌块墙体防裂施工
12.
The Research of Technology of Reinforced Concrete-supporting Beam by Hydraulic Splitter
钢筋混凝土内支撑梁液压劈裂破除施工技术研究
13.
Key Technology for Erection of 1000kV Transmission Line by Parallel Synchronous Traction of 8-Bundled Conductors Divided Into Two Groups
特高压11标段8分裂导线并行分组同步牵引架线施工关键技术
14.
fracture-assisted steamflood technology
压裂辅助蒸汽驱工艺
15.
propellant-based technology
推进剂燃烧压裂工艺
16.
Technology of Plugging Fracture and Fracturing Technology in Fractured Low Permeability Oil Reservoir
低渗透裂缝性油藏封堵裂缝后转向压裂工艺
17.
Winter construction plan of concrete bridge and crack-preventing measures
混凝土桥梁冬季施工方案及防裂措施
18.
The selection of primary parameters of demolishing the foundation of air compressor in the coal mine by static fragmentation measure, implementation method and blasting results are presented.
介绍了用静态破裂法拆除煤矿空压机基础的主要参数选取、施工方法及破碎效果。