1.
Countermeasures against Abnormal Temperature Rise of Cooling Stave in Taphole Area of No.7 BF of Shangguan Iron and Steel Co.,Ltd.
韶钢7号高炉铁口区域冷却壁温度异常升高的处理
2.
Molten Iron Flow Rate Measurement of Blast Furnace Taphole Based on Image Processing
基于图像的高炉出铁口铁水流量检测
3.
Preliminary Research and Application on New-type Energy-saving Tuyere of Smelting Furnace;
炼铁高炉新型节能风口的研究及应用
4.
The Practice of Transforming the Main Trough of Blast Furnaces with Single Taphole into Iron Store Structure with New Anti-explosive Castable Refractory
新型防爆铁沟浇注料与单铁口高炉出铁主沟储铁式结构改造实践
5.
The tuyere center measuring method and error analysis of iron-smelting furnace
炼铁高炉风口中心测定方法及误差分析
6.
Injection of fuel through tuyere is an important process for decreasing coke rate,reducing energy comsumption,and thus raising economic gain.
燃料经风口喷入高炉是炼铁降焦节能提高经济效益的重要手段。
7.
Development of Ultra Low Cement Prefabricated Part for Fork Location of Blast Furnace Lander
高炉出铁沟岔口用超低水泥浇注料预制件的研制
8.
White-hot liquid iron is run off through the tapping hole and then is taken to the converter, open-hearth furnace or electric furnace to be made pure.
炽热的铁水从出铁口流出,然后被送到转炉,平炉或电炉提纯。
9.
Installation of bell-less top steel ring for blast furnace
炼铁高炉无料钟炉顶钢圈的安装技术
10.
Research on Softening Properties of Ferrous Burden in Blast Furnace
高炉用含铁炉料软化特性的试验研究
11.
Physical modelling of hot metal flow in a BF hearth
高炉炉缸内铁水流动特性的物理模拟
12.
The hydraulic pressure clay gun is smelts iron one of blast furnace important equipment, may facilitate stops up the taphole, in order to next smelting.
液压泥炮是炼铁高炉的重要设备之一,可方便的将出铁口堵住,以便下一次冶炼。
13.
The iron extracted from the blast furnace is known as pig iron .
从高炉中提炼出的铁叫生铁。
14.
To smelt iron ore in a blast furnace can obtain iron.
在高炉中熔炼铁矿石,可取得铁。
15.
Then it pumped the water through a considerably greater height by means of high pressure steam generated in an iron boiler.
然后,借助于一口铁锅炉中产生的高压蒸汽,将水抽到比先前高度高出很多的地方。
16.
It expoundes basic moving laws of furnace charge and gas from HC FeCr smelting in electric arc furnace.
论述了矿热炉冶炼高碳铬铁炉内炉料和炉气的基本运动规律。
17.
Modification and optimization of the nozzle-tapping machine for the 1750 blast furnace at Jinan Iron and Steel Co.
济钢1750m~3高炉炉前开口机的优化改造
18.
The Situation of Serious Disorders and Trentment of the No.10 BF of First Iron-smelting Plant at Masteel;
马钢一铁总厂10~#高炉炉况严重失常及处理