1.
Modification Design on High Temperature Flue Duct of 410 t/h Boiler
410t/h锅炉高温炉烟管道的改进设计
2.
The Practical Research on Increasing the Blast Temperature of Hot Blast Stove of Hansteel's 2~# BF
汉钢2~#高炉热风炉提高风温实践研究
3.
Influence of Increasing Blast Temperature on Blast Furnace with Blending Coke Oven Gas
掺烧焦炉煤气提高风温对高炉的影响
4.
Treating the Increasing Water Temperature Difference of the Hearth of 8~#BF in Xuanhua Steel
宣钢8号高炉炉缸水温差升高的处理
5.
high temperature salt bath electrode furnace
高温电极盐浴电阻炉
6.
automatic temperature recording metre for the blast furnace
高炉温度自动记录器
7.
The temperature of the blast furnace raced up.
高炉的温度急剧上升。
8.
This burner is designed for high temperature radiation from the burner block.
该炉头设计为从炉头砖高温辐射。
9.
Applications of SVM to Predict Silicon Content in Hot Metal;
支持向量机在高炉炉温预报中的应用
10.
The Application and Research of Intelligent Control about Temperature Predict Inside Blast Furnace;
智能控制在高炉炉温预测中应用研究
11.
Production Practice of BF Temperature in 4350m~3 BF at TISCO
太钢4350m~3高炉稳定炉温的生产实践
12.
Numerical study on furnace temperature uniformity of annealing furnace with high speed burners
高速烧嘴退火炉炉温均匀性数值研究
13.
Measures Against Abnormality of Differential Water Temperature in No.1 BF Hearth of Qianan Iron and Steel Co,Ltd
迁钢1号高炉炉缸水温差异常的处理
14.
Simulation of Temperature Field and Stress Field in the Hearth and Bottom of Laiwu Steel's No. 3 BF
莱钢3~#高炉炉缸炉底温度场和应力场模拟
15.
Simulation Calculation and Analysis of Hearth and Bottom Temperature Field of HISGC BF No. 1
杭钢1号高炉炉缸、炉底温度场模拟计算及分析
16.
Numerical Simulation of Hearth and Bottom Temperature Field on Jigang No. 2 Blast Furnace
济钢2号高炉炉缸炉底温度场数值模拟
17.
Combined Prediction Model of BF Hot Metal Silicon Content and Mathematical Model of Curves by Cross Thermometer;
高炉炉温组合预报和十字测温数学建模
18.
The Intelligent Control over Temperature of Electric Heater in High Temperature Mechanics Experimental Machine;
高温力学试验机电加热炉炉温智能控制