说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 注砂
1.
super-compact injection blender
高度紧凑的注砂混合罐
2.
Reinforcing this layer by grunting mode is introduced.
介绍采用注浆方式来加固砂卵(砾)石层。
3.
Cyclic Water-flooding Technique Research on Sub-sea Distributary Channel Sands
水下分流河道砂体周期注水技术研究
4.
A Study on Permeation Grouting in Gravel Layer and Application
砂砾层渗透注浆机理研究与工程应用
5.
TYPICAL AUTHIGENIC MINERAL ASSEMBLAGES AFTER CO_2 INJECTED INTO SANDSTONE
CO_2注入砂岩后的典型自生矿物组合
6.
Construction techniques of shaft water control by sanding and grouting at hydrostatic level
静水抛砂注浆治理井筒突水施工技术
7.
Study on Simulation Grouting Experiment in Gravel & Mechanism of Permeating Grouting;
砂卵(砾)石层模拟注浆试验及渗透注浆机理研究
8.
Research on the Groutability and Application of Permeation Grouting in Sand and Gravel Stratum;
砂砾地层渗透注浆的可注性及应用研究
9.
Application of post-conglomerating technology in processing expansion concrete piles used for solid-stratum earth;
厚砂层地区钻孔灌注桩后注浆技术应用
10.
Applied Study on Post-Grouting Technology for Long Bored Pile down into Sand Layer
钻孔灌注长桩进入砂层的后注浆技术应用研究
11.
The sand faced-iron mould casting process is a special iron castings production process, according which castings are to he cast in the iron moulds having a thin layer of the resin sand facing in their inner surfaces.
铁型覆砂铸造是指在金属型(铁型)内腔覆上一薄层树脂砂,然后采用这种覆砂铁型浇注铸件。
12.
How much pouring temperature of EPC should be improved than that of sand mould casting
消失模铸造的浇注温度应比砂型铸造提高多少
13.
Discussion on the Method for EOR of Oil Sand at Waterflooding Oilfield Later Stage
注水开发后期提高油砂体采收率方法探讨
14.
Driving/Extracting/ Compacting Equipment for Sand and Stone Pile Construction by Air Pressure and Vibration
气压灌注振动沉拔挤密砂、石桩施工设备
15.
Study on the Smart Properties of the Graphite Slurry Infiltrated Steel Fiber Concrete (GSIFCON);
石墨水泥砂浆注浆钢纤维混凝土智能性质研究
16.
Experimental Research on Grouting Mechanics in Clayey Sand Using Super-Micro Cement;
砂土层中超细水泥注浆机理的试验研究
17.
Study on Deicing and Snow Melting of Graphite Slurry Infiltrated Fiber Concrete;
石墨砂浆注浆钢纤维混凝土融雪化冰研究
18.
Construction technology and cost analysis of bored piles with high pressure & sand free grouting;
高压无砂注浆钻孔桩施工工艺及成本分析