说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 冷切焦水
1.
APPLICATION OF COKE COOLING WATER SEALED TREATMENT TECHNOLOGY IN DELAYED COKER AT YANSHAN
冷切焦水密闭工艺在燕山焦化装置的应用
2.
A Comment on COG Cooling and Tar and Ammonia Liquor Separating Processes
焦炉煤气冷却及焦油氨水分离工艺的评述
3.
Research on Water Treatment Agent of Recycle Cooling Water of Coke Plant of TISCO;
通钢焦化厂循环冷却水水质处理剂的研究
4.
The Research of Modified Kino Adhesive of Carbon Powder Cold Firm Shaping
改性水溶性树脂焦粉冷固成型粘结剂的研制
5.
Study on High Heat-Load Direct-Water Cooling and Sagittal Focusing Double Crystal Monochromator;
高热负载水冷弧矢聚焦双晶单色器研究
6.
CORROSION OF WATER COOLER TUBES IN DELAYED COKING UNIT AND THE PROTECTION
延迟焦化冷却水箱管束腐蚀原因及对策
7.
High-efficiency Treatment of Cooling Wastewater in Coke Tower by Compound Chemicals
复合药剂高效处理焦炭塔吹气冷却废水
8.
Faults Analysis and Countermeasures for Coke Dry Quenching Circulation Cooling Water Filters
干熄焦循环冷却水过滤器故障分析及解决措施
9.
Operation and Management of the Gas Purification Cooling Water in the Coking Plant of Baotou Steel
包钢焦化厂煤气净化系统冷却水的运行及管理
10.
Technological improvement in cooling water system of Coking Plant in WISCO
武钢焦化一化产冷却水系统的技术改进
11.
Performance insufficiency analysis and countermeasure of the water-jet coal coke cutter
水射流煤焦切焦器性能下降原因分析及解决方法
12.
Elevating the temperature of the cooling water or reducing the wall temperature before water quenching can prevent walls from yielding effectively.
提高冷却水温度或降低进水冷焦前塔体温度能有效防止塔体产生塑性变形。
13.
mixed diced fruits or vegetables; hot or cold.
混合的切成方块的水果或蔬菜;热时或冷时食用。
14.
Brief Introduction of Water Cooling-type Drying Tower for 30 t/d Nylon 6 Chips
日产30t锦纶6切片水冷却式干燥塔结构简介
15.
Joule-Thomson refrigerator
焦耳-汤姆孙致冷器
16.
This decision checked Mary's eagerness
这话说得斩钉截铁,顿时给心头热切的玛丽泼了一瓢冷水。
17.
Study on Action Mechanism and Experiment with Water Vapor as Coolants and Lubricants in Green Cutting;
水蒸汽作绿色冷却润滑剂的作用机理及切削试验研究
18.
Research on Green Degree Evaluation System of Superheated Water Vapor as Coolants and Lubricants;
过热水蒸汽作切削冷却润滑剂时绿色评价体系的研究