说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 奥运工程
1.
Application of Warm Mix Asphalt Mixture in the Road Project for Olympic Games
温拌沥青混合料在奥运工程中的应用
2.
Establish comprehensive information system for the Olympic construction in Beijing, and coordinate commands over all the Olympic project construction throughout the city.
建立北京奥运建设综合信息系统,协调指挥全市奥运工程建设。
3.
The green area shall accounts for 40-50% of the total of all Olympics projects.
奥运工程用地绿化面积总比例达到40-50%。
4.
We will use the most advanced and reliable technology for all Olympic projects.
我们将在所有的奥运工程中采用最先进可靠的技术。
5.
Implementing Food Project for Beijing Olympics and Establishing Olympic Food Guarantee System;
实施北京奥运食品工程 建立奥运食品保障体系
6.
Solar photo electricity application project and solar thermal utilization project in Olympic Park are constructed.
建设奥运公园光电利用工程、奥运公园光热利用工程。
7.
"Digital Olympics" Office will be established so as to work closely with the technology projects for "Digital Olympics".
成立"数字奥运"工作办公室,与奥组委技术部紧密配合,推进"数字奥运"各项工程建设。
8.
The engineering of the“ Nest” of Beijing Olympics in2008, is completely the crystallization of scientific techniques!
(北京2008奥运会鸟巢工程,完全是科学技巧的结晶!
9.
The engineering of the “Nest” of Beijing Olympics in 2008, is completely the crystallization of scientific techniques!
(北京2008奥运会鸟巢工程,完全是科学技巧的结晶!)
10.
The Value Engineering Analyses of the Cost Risks for the General Contract for the Olympic Stadiums Projects;
奥运场馆总承包成本风险的价值工程分析
11.
Engineering Geolgical Environmental Quality Analysis and Assessment on Olympic Park;
奥运公园工程地质环境质量分析与评价
12.
Quality Management in the Design Project of the Olympic Distributing System Egineering;
奥运分布系统工程设计项目的质量管理
13.
The Forecast and Analysis of the Strategic Goals for the Track and Field Events in National "119 Project" in 2008 Beijing Olympic Games;
北京奥运会实现“119工程”田径项目目标的分析
14.
The Development of Genetic Engineering and the Future of Olympic Game;
基因工程的发展与现代奥林匹克运动的未来
15.
Research on the Project Management of the Power Station Construction Outside the Olympic Venues
奥运场馆外电源建设工程项目管理研究
16.
Survey to Chinese "119 Project" Development during two "Olympic Cycle"
对两个“奥运周期”我国发展“119工程”的审视
17.
The construction of geothermal heating project in Olympic Garden will be completed to serve 0.40 million square meters in the stadiums and gymnasiums for space heating.
建设奥运公园地热供暖工程,为奥运场馆提供地热采暖面积40万平方米。
18.
2008 Olympic Games: A good job in preparatory work is required.
奥运:认真做好准备工作