1.
The results suggest that a reservoir with low vertical permeability and interlayer above the water oil contact would have good effect of water extraction and cone control.
研究表明,对于垂向渗透率较低、水界面之上存在夹层的储集层,采水控锥效果显著。
2.
Water cone inhibiting by water recovery for horizontal wells in laminar layer bottom water reservoir
薄层底水油藏水平井采水抑锥方法研究
3.
Research on Data Acquisition and Control System of Taper Piston Ring Conical Degree Measuring Instrument;
锥面活塞环锥度方向识别仪数据采集及控制系统的研究
4.
Controlled Blasting Demolition of 38 m High Reverse Cone-shape RC Water-tower
38m高倒锥形钢筋砼水塔控爆拆除
5.
Fluid control one-way valve used cone disc, sealed a good performance.
液控单向阀采用锥形阀芯,因此密封性能好。
6.
NEW-TYPE HORIZONTAL WELL COMPLETION METHOD OF DELAYING AND CONTROLLING BOTTOM WATER CONING
延缓和控制底水锥进的水平井完井新方法
7.
Fluid loss should be controlled with Drispac R and Drispac SL as required.
按要求用高粘或低粘锥斯派克控制失水。
8.
Study on Prediction and Control of Water Coning in Fractured-Vuggy Carbonate Reservoir
碳酸盐岩缝洞型油藏水锥预测及控制研究
9.
Full-mechanized Caving Mining Test under Soft Sand Aquifer
松软砂岩含水层下控水综放开采试验
10.
the epoxy resin coating is used to protect the vane front,flow guide vane,flow discharge awl,and support cover and so on.
⑤对叶片正面、导水叶、泄水锥及支持盖等部件可采用环氧金刚砂涂层防护。
11.
Information Quarterly on Tsetse and Trypanosomiasis
采采蝇和锥虫病资料季刊
12.
A tapering spike of ice formed by the freezing of dripping or falling water.
冰柱,冰锥锥状冰,由滴水凝固形成
13.
Bureau for African Tryanosomiasis
非洲锥体虫病控制局
14.
Thechange in the number of pyramidal cells in cerebral cortex afterpre-natal exposure to HTO was observed by a technique for countingcerebral cells.
采用脑细胞计数技术,观察了大鼠出生前受氚水照射后其大脑锥体细胞数的改变情况。
15.
and control the productive schedule.
采取煤壁浅孔注水,控制生产进度;
16.
The Design of Control Center of Water Data Automatic Acquisition System;
水情数据自动采集系统—控制中心设计
17.
Study on the Strategic Cost Control for Oil Picking Factory in Ultra-High Water Cut Stage;
特高含水期采油厂战略成本控制研究
18.
Design and Realization of Automated Control System of Mining Vessel
水采船自动化控制系统的设计和实现