1.
The Study of Early-dismantling Template System and Dismantling Template Time of Concrete Structure;
混凝土结构早拆模板体系与拆模时间的研究
2.
Research of Optimal Mold Parting Methods Based on Pro/Engineer
基于Pro/E模具最优拆模方法的研究
3.
Concrete curing should immediately start after frame removed.
6砼拆模后立即均匀涂刷砼养护液。
4.
THE TECHNOLOGY OF ASSEMBLED FIELD-CAST CONCRETE WALL WITHOUT DEMOULDING
拼装式现浇混凝土墙体免拆模板技术
5.
Experimental Study on Non-Dismantling Template of the Concrete Contains Glass Fiber
玻璃纤维混凝土免拆模板的实验研究
6.
Door Module Remove/Install
车门模组拆卸/安装
7.
KEY OFDISCONNECT TRANSMISSION CONTROL MODULE.
关闭。拆开变速控制模组。**
8.
Remove the door module from the trim panel.
从饰板上拆卸车门模组。
9.
Research on disassembly model and disassembly sequence planning based on modularization
基于模块化的拆卸模型及拆卸序列规划研究
10.
Drop-forged rivetless chains for conveyors
GB/T17482-1998输送用模锻易拆链
11.
Scot has a do-it-yourself model airplane kit.
斯科特有一套可拆装的模型飞机组件。
12.
DISCONNECT THE SEAT BELT CONTROL MODULE.
拆卸座位安全带控制模组。**
13.
Airbag Control Module Connector Removal
安全气囊控制模组接头拆除
14.
Push Button Module Remove/Install
按压按钮模组的拆卸/安装
15.
Product information model for disassembly and recycling is developed.
建立面向拆卸回收的产品信息模型。
16.
DISCONNECT & REMOVE THE BODY CONTROL MODULE FROM THE JUNCTION BLOCK.
从集成板上拆下并移走主体控制模组。*
17.
A Method of Disassembling Assur-Groups for Identifying and Modelling by Computer
适于计算机辨识建模的杆组拆分方法
18.
Study of Chiral Separation of Tryptophan Enantiomers and Process Simulation;
色氨酸对映体的手性拆分及过程模拟