说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 白龟山水库
1.
On investment control in rehabilitation project of Baiguishan Reservoir;
浅议白龟山水库除险加固工程建设的投资控制
2.
The Primary Inquisition of Soil Microorganism in The Reservoir Peripheral;
白龟山水库周边土壤中微生物的初步调查
3.
On relationship between water price reform of Baiguishan Reservoir and sustainable development of water resources;
浅析白龟山水库水价改革与水资源可持续发展的关系
4.
Huoshan County,Anhui Province Bailian Diversion Tunnel Closure Cliff Reservoir Construction Technology
安徽省霍山县白莲崖水库导流洞封堵施工技术
5.
The effects to water balance of the leaf chafer Potosia brevitarsis under different water supplying
不同补水方式对白星花金龟水分平衡的影响
6.
Application of PACT/WAR System in Sewage Treatment Plant in Guishan Industrial Area
PACT/WAR系统在龟山工业区污水处理厂中的应用
7.
Forces on Upper Elbow Section of Water Intake and Outlet in Upper Reservoir at Baishan Pumped Storage Power Station
白山抽水蓄能电站上库进出水口上弯段结构受力浅析
8.
Beacon Hill Intermediate Level Salt Water Service Reservoir
笔架山中海水配水库
9.
Beacon Hill High Level Fresh Water Service Reservoir
笔架山上食水配水库
10.
Beacon Hill Intermediate Level Fresh Water Service Reservoir
笔架山中食水配水库
11.
Piper's Hill Ultra High Level Fresh Water Service Reservoir
琵琶山超高食水配水库
12.
Piper's Hill Low Level Fresh Water Service Reservoir
琵琶山下食水配水库
13.
Piper's Hill High Level Fresh Water Service Reservoir
琵琶山上食水配水库
14.
A Discussion on LI Bai s “Exile in Tiaozhi”;
李白先世“谪居条支”别探——条支即龟兹,兼及月氏、屈支、库车、金陵等地名
15.
EFFECTIVE STRESS DYNAMIC ANALYSIS OF BAIHE EARTH DAM AT MIYUN RESERVOIR DURING THE TANGSHAN EARTHOUAKE ON JULY 28, 1976
1976年7月28日唐山地震时密云水库白河主坝有效应力动力分析
16.
Tortoise and Snake Hills face each other across the river.
龟蛇二山隔江相望。
17.
Current Status and Protection Measures in Water Source Area of Hengshan Reservoir
横山水库水源地水质现状及保护对策
18.
Danger elimination of construction leakage during reinforcing water release tunnel in Peishan Reservoir
培山水库放水隧洞施工漏水除险技术