说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 过充性能
1.
Electrochemical behavior of electrolyte additive for overcharge protection of Li-ion batteries
2-氯苯甲醚对锂离子电池防过充性能的影响
2.
Filling Process Simulation of Die-casting and Performance Study
罩壳压铸件充型过程模拟及性能研究
3.
Study on performance of evaporation unit of separated heat pipe during charging process
分离式热管蒸发段充冷过程性能研究
4.
Overcharge performance of LiCoO_2-LiMn_2O_4 blended cathode
LiCoO_2-LiMn_2O_4混合正极的过充电性能
5.
On charge, the counter-voltage or overvoltage of the battery could be so high as to restrict the charging characteristics at low temperatures.
充电时,蓄电池的反电压或过电压太高,以致限制了低温充电性能。
6.
Research on Power Consumption of Injection Filling Process Based on Hydraulic Vibration Injection Molding Machine
液压脉振注射充模过程的能耗特性研究
7.
It is not possible to try to salvage or change the polarity correctly by charging.
试图补救或通过充电的方法把极性改过来是不可能的。
8.
By the reflexive model, workflow system has the flex ability to changing circumstance.
通过引进自反特性,工作流系统具备了灵活可扩充的动态适应能力。
9.
Preparation of LiFePO_4 and Its Structure Change and Performance Study in the Charge-discharge Cycles
LiFePO_4的制备及其充放电过程中的结构演变和性能研究
10.
Effects of overcharging on safety performance of Li-ion battery for electric bicycle
过充对电动自行车用锂离子电池安全性能的影响
11.
He was able to fulfil himself through music.
他通过音乐能充分地发挥自己的才能.
12.
From the intuition form of the design kicking-off to the open possibility of the design result, every tache during the entire process is dramatic.
从设计起点的直觉形式到设计结果的开放可能性,整个过程充满了戏剧性。
13.
The charging process therefore requires the expenditure of energy.
所以,充电过程需要消耗能量。
14.
Sleeping too long is a lame excuse for Being late.
睡过了头不能成为迟到的充足理由。
15.
Study on Aerating Performance of Swirl Jet Separate Aerator
旋流—射流分选充气器充气性能的试验研究
16.
Properties of oil-extended solution polymerized styrene-butadiene rubber filled with different silica
不同白炭黑填充充油溶聚丁苯橡胶的性能
17.
An Experimental Study on Aerating Performance of Swirl-Jet Separation Aerator
旋流-射流分选充气器充气性能的试验研究
18.
This paper studies the possibility of full-water of mining by the way of analysising hydrogeological conditions when the coal seams is mined, and taking further analysising the geological structure on which affect underground water.
本文通过对水文地质条件的分析,揭示矿井充水的可能性,进一步分析构造对地下水的控制作用。