1.
Secondary development method on common graphic primitive based on AutoCAD
基于AutoCAD常用采矿图元的二次开发
2.
Optimization of parameters when practising multi unit and muti step stage room mining method
多单元多步骤阶段矿房采矿法参数优化
3.
MATLAB finite element simulation of mining tunnel and ANSYS comparing analysis
采矿巷道MATLAB有限元仿真及ANSYS对比分析
4.
This paper discusses the renewable method of mine topographic map of underground mining.
论述了井下开采矿井矿用地形图的更新方法。
5.
Excavation Engineering Charts and Management of Mineral Resources;
采掘工程图件与矿产资源管理的关系
6.
Practical Skills of AutoCAD Drawing in Mining
AutoCAD2006定制采矿制图模板的技巧
7.
Discrete Element Analysis of Goaf Stability in the Fragment Ore Section of Orebody №105 in Gaofeng Mine
高峰矿105号矿体碎裂矿段采空区稳定性离散元分析
8.
Discussion on Anti-sulfuration Dust Explosion Measurement in Multicell and Multi-process Phase Mining
多单元多步骤阶段矿房采矿法防硫化矿尘爆炸措施的探讨
9.
A Study on Library Books Acquisitioning in the Libraries of Mining Colleges and Universities
高等矿业院校图书馆图书采访工作初探
10.
The residual value of the mine after all of the coal is removed is estimated to be $5.
煤被开采完毕后该矿的残值预计为5美元。
11.
Development Discussion of Iron Mine Exploitation and Smelting Iron Industry of Shanxi Province in Song, Yuan, Ming and Qing Dynasty;
宋元明清山西铁矿开采与冶铁业发展述论
12.
Study on Generation and Control of New Mineral Particles in ASP Flooding Produced Water
三元复合驱采出水中新矿微粒生成及控制研究
13.
Finite Element Analysis of Filling Mass -Orebody-Rock Mass Stability for High-Level-Mining in Anqing Copper Mine
安庆铜矿高阶段回采充填体—矿体—岩体稳定性的有限元分析
14.
pillar robbing
【采矿】回收矿柱法
15.
Research of Intelligent Inference and Graphical Presentation of Excavate Coal Working Face Supersedure in Coal Mine
煤矿采煤工作面接替的智能推理与图形化研究
16.
The Dynamic Managed CAD System Model of the Plan on the Colliery Excavate Engineering
煤矿采掘工程平面图动态管理CAD系统模型构造
17.
Study on the Dynamic Management System of Excavation Engineering Plans in Colliery
煤矿采掘工程平面图动态管理CAD系统研究
18.
Research on Key Technologies of Mine Roadways Geological Sketch Picture Drawing Based on GIS;
基于GIS的采矿巷道地质素描图绘制技术研究