1.
Research about Approach to Designing Organization--Three-Phase Approach;
组织设计方法研究:三阶段设计方法
2.
conceptual phase
初步(草图)设计阶段
3.
The brief analysis design stage is one of project construction cost control main stages;
浅析设计阶段是工程造价控制的主要阶段之一
4.
Research of the Investment Control in Construction Project;
工程建设项目设计阶段投资控制研究
5.
Elementary Analysis on Control of Construction Cost in Design Stage of Engineering Construction;
浅析工程建设项目设计阶段造价控制
6.
Discussion on the Project Cost Control of the Design Stage in the Course of Engineering Construction;
工程建设过程中设计阶段的造价控制
7.
On the Importance of Cost Controlling in Design Stage of Construction Project;
建设工程设计阶段造价控制的重要性
8.
Designing is the Critical Stage of the Investment Control of a Construction Project;
设计是建设项目投资控制的关键阶段
9.
On engineering cost control in design stage of construction project
论建设项目设计阶段工程造价的控制
10.
Research on Safety Design and Construction Safety on Engineering Project Design Stage;
建设项目设计阶段安全设计与施工安全研究
11.
Identify definition phase engineering deliverables
确定工程设计定义阶段的可交付结果
12.
Preliminary Stage of Chinese Interior Design and its Features
中国室内设计的雏形阶段及其特点
13.
Study on Investment Control and Evaluation in the Period of Engineering Design;
工程设计阶段的投资控制及评价研究
14.
On Strengthening Engineering Cost Management at the Design Stage;
对加强设计阶段工程造价管理的认识
15.
Application Studies on Value Engineering in Stage of Product Design;
价值工程在产品设计阶段的应用研究
16.
Analysis on effective cost control measures in design and construction phases;
浅析设计和施工阶段造价的有效控制
17.
How to Cultivate Industrial Designers for Manufacture Industry Today;
如何为现阶段制造业培养工业设计师
18.
The affection of the phase of design to project cost controlling;
浅谈设计阶段对工程造价控制的影响