1.
On Revising Rails of Grab Bucket in the Pellet Fine Stockroom for Sintering Shaft Urnace
烧结竖炉球团精矿库抓斗吊轨道改造
2.
Application of the Hybrid Fuzzy Control of the Sintering Shaft Furnace;
模糊PID混合控制系统在烧结竖炉中的应用
3.
Overall Installation of No.3 Shaft Furnace Expansion Alteration in No.1 Sinter of Masteel;
马钢第一烧结厂3~#竖炉扩容改造整体安装
4.
Temperature Fuzzy Control System for Vertical Coal Powder Combustion Furnace
竖式煤粉燃烧炉的温度模糊控制系统
5.
Treatment of burning-through of gas mixing room top and preheating zone casing of vertical shaft
竖炉混气室顶部和预热带炉皮钢板烧穿的处理
6.
Experimental study on MSW incineration with co-current shaft furnace
城市生活垃圾并流竖炉焚烧模拟实验研究
7.
ANALYSIS ON CALCINING TECHNOLOGIES FOR POT CALCINER IN CHINA
中国竖罐式炉煅烧石油焦技术分析与研讨
8.
A study on shaft kiln to calcine dolomite with coke-oven gas
燃用焦炉煤气的竖窑煅烧白云石技术研究
9.
MECHANISM AND CONTROL OF CHARGE COHERE FOR DRI USE COAL REDUCING AGENT AND SHAFT FURNACE
煤基竖炉直接还原铁炉料粘结机理及控制
10.
Study on the Structure Optimum Design of an Incineration Boiler Furnace;
垃圾焚烧锅炉炉膛结构优化设计研究
11.
In this paper, the effects of proportioning PF hematite concentrates on shaft furnace production in№1 sintering plant of MAGANG were presented.
介绍了马钢一烧竖炉配用巴西PF精矿生产球团的效果。
12.
Simulation Platform for Optimal Operation and Control of Roasting Process in Shaft Furnace
竖炉焙烧过程优化操作运行与控制仿真实验平台
13.
The waste heat boiler of sinter ring cold machine was developed to recover sensible heat of sintering mine.
为回收烧结矿显热,研制出烧结环冷机余热锅炉。
14.
Investigation of the Power on the MC Cell Firing Process
太阳能电池烧结过程中烧结炉的功率优化设置
15.
The analysis of the damaged reason for pot type calcine furnace and the probe into the path which prolong the age of the pot type calcine furnace.
根据罐式煅烧炉结构及硅砖的特点,分析罐式煅烧炉破损原因,探讨延长罐式煅烧炉炉龄的途径。
16.
Meanwhile, Wet methods of lining building, firing and sintering are discussed.
同时,对湿法筑炉及其烘炉与烧结方法进行探讨。
17.
Simulation of Enhancing Heat Transfer on Waste Heat Boiler of the Incinerator and Analysis of Its Slagging and Fouling;
焚烧炉余热锅炉强化换热数值模拟与结渣分析
18.
The Mathematics Model of LTCC Sintering Furnace Temperature Field
低温共烧陶瓷专用烧结炉温度场的数学模型