说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 模糊程度
1.
The Decision-making Preference under Different Ambiguity Conditions
不同模糊程度下模糊决策的决策偏好
2.
Research on MIS Life Cycle Process Fuzzy Metrics Model;
MIS生存周期过程模糊度量模型研究
3.
Study on the Fuzzy Words Showing Degree in Modern Documents
现代公文中表程度的模糊词语的研究
4.
The Fuzzy Synthetic Evaluation of the Risks of Commercial Banks
商业银行金融风险程度的模糊综合评价
5.
Huanren Reservoir Operating Rules in East-to West Water Transfer Project with Fuzzy Optimal Model;
东水西调工程桓仁水库调度方式的模糊优选
6.
A Study on the Optimization of Fuzzy Construction Project Scheduling based on Genetic Algorithm;
基于遗传算法的模糊工程进度优化研究
7.
Research on Construction Project Schedule Management Based on Fuzzy Comprehensive Evaluation;
基于模糊综合评价的工程项目进度管理研究
8.
Fuzzy scheduling with parallel machines batch process based on immune algorithm;
基于免疫算法的并行机间歇过程模糊生产调度
9.
Fuzzy Analysis of the Economic Risk Factor and Degree of Mining Investment;
矿业投资经济风险因素与风险程度的模糊分析
10.
A Fuzzy Difficulty Evaluation Method of Librarians Examination Questions
图书馆业务考核题目难易程度的模糊评价方法
11.
Application of Gray Fuzzy Theory to Evaluation of Complicated Degree for Geological Structure
灰色模糊理论在地质构造复杂程度评价中应用
12.
Evaluation of image scrambling degree utilizing fuzzy entropy theory
运用模糊熵理论进行图像置乱程度评价
13.
Soft cobalt-ion concentration measurement for purification process based on fuzzy LS-SVM
基于模糊LS-SVM的净化过程钴离子浓度软测量
14.
Levels of Complexity of Electromagnetic Environment Based on Fuzzy Mathematics
基于模糊数学的电磁环境复杂程度评估
15.
Empirical Analysis of Enterprise's Stakeholders' Interest Requirement Degree
企业利益相关者利益要求程度的模糊检验
16.
This paper suggests a model for comprehensive assessing aging damage extent of irrigation project by fuzzy assemblage theory.
应用模糊集合理论建立了灌区工程老化损坏程度综台评判模型。
17.
One New Method of Measure of Medium Truth Scale and Decomposition of Fuzzy Predicate
一种新的中介真值程度的度量方法及模糊谓词的分解
18.
Fuzzy Finite Element Method of Fuzzy Reliability Analysis of Structures;
结构模糊可靠度分析的模糊有限元法