1.
The Modifications of the Shaoguan Smelter's No.1 Waste Heat Boiler
韶关冶炼厂1~#余热锅炉的节能改造
2.
The Optimal Research on the Second Flue System of Zinc Refinery in Shaoguan Smelter;
韶关冶炼厂锌精馏二系统烟道优化研究
3.
The Development for Integrated Automation System of 110kV Substation in Shaoguan Smelting Plant;
韶关冶炼厂110KV变电站综合自动化系统的研制
4.
Study on Measurement of Vegetation Restoration on Wasteland Contaminated with Heavy Metals Near Shaoguan Smelter;
韶关冶炼厂矿业废弃地植被恢复措施的研究
5.
Introduction of metallurgical wastewater advanced treatment project for Shaoguan Smelt Plant
韶关冶炼厂废水深度处理站设计及运行
6.
Application of Membrane Technology in Wastewater Treatment System of Shaoguan Smelting Plant
膜技术在韶关冶炼厂废水处理系统中的应用
7.
Modification and Practice on Dry Absorption Equipment of System Ⅰ in Shaoguan Smelter
韶关冶炼厂Ⅰ系统干吸设备的改造与实践
8.
Reforming projects of sintering process in Shaoguan smelterⅡsystem
韶关冶炼厂Ⅱ系统烧结工序挖潜改造设计
9.
This paper presents the modification of acid distributing device in drying and absorption tower of the acid-making system in Shaoguan Smelter.
介绍了韶关冶炼厂制酸系统干吸塔分酸装置的改造实践。
10.
The Balaklala smelter was finally shut down in July, 1911.
巴拉克拉拉冶炼厂于1911年7月终于停产关闭。
11.
Code for design of titanium smelting technology
钛冶炼厂工艺设计规范
12.
Code for design of magnesium smelting technology
镁冶炼厂工艺设计规范
13.
Code for process design of copper smelters
铜冶炼厂工艺设计规范
14.
Practice in Engineering Management of Technical Renovation of Guixi Smelter Copper Smelting System;
贵溪冶炼厂铜冶炼系统技术改造工程管理实践
15.
Reconstructing by New OG Technique for the 120 t Converter at No.3 Steelmaking Factory of SISG
韶钢三炼钢厂120t转炉除尘系统新OG改造
16.
Technical modifications to the turret-movable ladle cover device for the Consteel Mill at SISG
韶钢炼轧厂连铸回转台钢包加盖装置技术改造
17.
Enrichment and Comprehensive Recovery of Germanium and Indium in Smelting Process of the Closed Blast Furnace;
韶冶密闭鼓风炉熔炼过程中锗铟的富集与综合回收
18.
The First Smelter Introducing Oxygen enriched Air Bath Smelting Technology in China--A brief account of technical modification in Daye Smelter;
我国第一座引进富氧熔池熔炼技术的工厂——大冶冶炼厂冶炼技术改造概况