1.
A standard switchyard connects the coilPCS to the utility gird.
线圈与PCS经标准开关站与电力网联接。
2.
Key Techniques of Development of Gasket Standard Query System
垫片标准查询系统开发中的关键技术
3.
Ready, aim, wait for it!Fire!
准备, 瞄准目标, 注意!开火!
4.
Position indicator with NAMUR is convenient for mounting accessories such as Limit Switch box,Positioner and so on.
NAMUR标准指示器便于安装位置开关、定位器等附件。
5.
Relation Between the Enterprise s Standardization and Developing the New Products;
浅谈企业标准化工作与开发新产品的关系
6.
Sustained Development of QCC Program Is a Driving Force for Adding Value of Quality Control System in Water Profession;
水利行业持续开展QCC活动与贯彻ISO9000标准的关系
7.
Discussing how to strengthen standardization administration in the proccss of scientific research and how to take occasion establish the quasi-standardization;
关于加强科研开发过程的标准化管理和“准标准”制定的时机选择问题
8.
Key Step of Development of Management Information System──The Establishment of Object System Standard System Code System
管理信息系统开发的关键环节──目标体系、标准体系、代码体系的建立
9.
Some Questions In Making Enterprises Standards According to GB/T1;
根据GB/T1及相关标准制定企业标准
10.
Peter took aim and fired.
彼德瞄准目标,开了枪。
11.
Take careful aim (at the target) before firing.
开火之前仔细瞄准(目标).
12.
Slow is fast." Watch your fields of fire, pick your targets, aim center mass, squeeze the trigger.
观察你的射击的位置,选中你的目标,瞄准中心点,扳动开关。
13.
Switch Resource Standardized Description Method for General-Utility ATS
通用自动测试系统中开关资源的标准化描述方法
14.
Research on Virescence and Forest Information Standardization in Shanghai and Related Software Development;
上海市绿化林业信息标准化研究及相关软件开发
15.
developers of related standards.
制定相关标准的人员。
16.
Standards Code [GATT]
标准法规〔《关贸总协议》〕
17.
The Relationship between MRP Ⅱ and ISO9000 Series Standards;
MRPⅡ和ISO9000族标准的关系
18.
Preliminary Discussion on Establishment of ISO 9000:2000 and Its Relationship with Other Standards;
试论ISO9000:2000标准的创建及其与相关标准的关系