说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 资源受限项目调度
1.
Approach for setting time buffers in resources-constrained project scheduling
资源受限项目调度中缓冲区的设定方法
2.
Research on Algorithms for Solving Resource-Constrained Project Scheduling Problems;
求解资源受限项目调度问题算法的研究
3.
Research on Project Scheduling Constrained with Flexible Resource Based on Heuristic Algorithm;
基于启发式算法的柔性资源受限项目调度研究
4.
Flexibility Resource Constraints Project Scheduling Problem on the Base of Critical Chain Method;
基于关键链的柔性资源受限项目调度问题研究
5.
Application of genetic algorithm in solving fuzzy resource-constrained project scheduling problem;
求解模糊资源受限项目调度问题的遗传算法
6.
Critical Chain Based Approach for Resource-constrained Project Scheduling;
基于关键链的资源受限项目调度新方法
7.
Heuristic approach for resource-constrained project scheduling problems
求解资源受限项目调度问题的启发式方法
8.
Genetic simulated annealing algorithm for resource-constrained project scheduling problem
应用遗传模拟退火算法实现资源受限项目调度
9.
Scheduling Problems of Resource-constrain Project Based on a Culture Genetic Algorithm
基于文化遗传算法的资源受限项目调度
10.
A Genetic Algorithm for Solving RCPSP
一种求解资源受限项目调度问题的遗传算法
11.
ACO for Solving Resource-constrained Project Scheduling Problem
一种求解资源受限项目调度问题的蚁群算法
12.
Research on Multi-mode Resource Constrained Project Scheduling Problem Base on Particle Swarm Optimization;
基于微粒群算法的多模式资源受限项目调度优化问题研究
13.
Research on Resource Constrained Project Schedule Problem Based on Ant Colony Optimization;
基于蚁群优化算法的资源受限项目调度问题研究
14.
Ant colony and particle swarm optimization algorithm-based solution to multi-mode resource-constrained project scheduling problem;
蚁群-粒子群算法求解多模式资源受限项目调度问题
15.
Constraint Propagation Based Algorithms for Solving Resource-Constrained Project Scheduling Problems
基于约束传播技术的资源受限项目调度问题求解算法
16.
A Hybrid Genetic Algorithms for Solving the Resource-Constrained Project Scheduling Problem
一种求解资源受限项目调度问题的混合遗传算法
17.
A Study on Multi-mode Resource Constrained Project Scheduling Problem Based on Ant Colony Algorithm
基于蚁群算法的多模式资源受限项目调度问题研究
18.
ACO for Solving MMRCPSP
一种求解多模式资源受限项目调度问题的蚁群算法