1.
It is not possible to disconnect at this time. The connection is currently busy with a connect or disconnect operation.
此时不能断开连接。连接现在正忙,有一个连接或断开连接操作。
2.
It is not possible to disconnect at this time. The connection is currently busy with a connect or disconnect operation.\0
此时不能断开连接。连接现在正忙,有一个连接或断开连接操作。\0
3.
SMJ:synopsis-based data stream multi-join operation
SMJ:基于大纲的数据流多连接操作
4.
A socket operation was attempted to an unreachable host.
套接字操作尝试一个无法连接的主机。
5.
Operation not allowed on non-connected sockets.
不允许对非连接的套接字执行此操作。
6.
This action has no connection at all with the operating state of the pneumatic manoeuvring system.
此动作完全没有连接到气动操纵系统操作状态。
7.
Unable to perform locking operation because the network is down.
无法执行锁定操作,因为网络连接中断。
8.
Do the following then disconnect from the network.
执行以下操作后断开网络连接。
9.
To try connecting again, do the following:
要重新尝试连接,请执行以下操作:
10.
Operation cannot be performed while connecting asynchronously.
在异步连接时,操作不能被执行。
11.
Cannot connect to that server operating system platform.
无法与该服务器的操作系统平台连接。
12.
An operation was attempted on a nonexistent network connection.
企图在不存在的网络连接上进行操作。
13.
The loopback operation is also used to troubleshoot DS1 connection problems.
环回操作也是用来排除 DS1 连接故障的。
14.
foolproof interconnection
防止错误操作的互连接法
15.
Not able to perform operation due to connection-less project.
由于存在无连接项目而不能执行操作。
16.
Choose a network connection for this scheduled synchronization.
为本次计划同步操作选择网络连接
17.
The requested operation cannot be completed because the terminal connection is currently busy processing a connect, disconnect, reset, or delete operation.
由于终端连接目前正在忙于处理一个连接、断开连接、复位或删除操作,无法完成该请求的操作。
18.
A socket operation was attempted to an unreachable network.
向一个无法连接的网络尝试了一个套接字操作。