1.
Improvement measure of frame-shaped underpass bridge construction and quality control of jacking process
框构地道桥施工改进措施和顶进过程质量控制
2.
Improvement of Fixed Hole Craft in Construction Technology of Kilometer Rig
千米钻机施工技术中固孔工艺的改进
3.
Analysis of Test on Insulation of High-voltage on Site
10kV交联电缆接头施工工艺分析及改进措施
4.
Improvement of Drawing Column Construction Method in the Single Story Industrial Building
单层工业厂房改造中拔柱施工方法的改进
5.
Construction primary contraction management present situation analyzes and improves;
建筑施工总承包管理现状分析及改进
6.
Improvement and Implementation of Management Information System for Power Transmission and Distribution Projects;
送变电工程管理信息系统改进及实施
7.
The Problems Existing in the Floor Fire Hazard Investigation and Improving Measures;
基层火调工作存在的问题及改进措施
8.
Enriching moral education with arts;
实施艺术教育,加强和改进德育工作
9.
Analysis of HDPE drainage pipe design and technological improvement
HDPE排水管道设计与施工技术改进分析
10.
Blowhole Formation Reason of Cylinder Head and Process-Improving Measures
缸盖气孔形成的原因与工艺改进措施
11.
Improvement of Hospital Infection Management in Blood Transfusion Department
输血科医院感染管理工作的改进措施
12.
Improving measures of the water supply processing technique implementing new criteria
执行新标准的给水处理工艺改进措施
13.
Discussion on the Defects in the Internal Control System of Construction Enterprise and the Improvement Measures;
论施工企业内部控制制度的缺陷与改进措施
14.
On the checkup and improvement for the situations of production management;
施工企业生产管理状况诊断与改进措施
15.
Design and Improvement of Back Reamer in Directional Drilling Non-excavation Pipe Laying Construction
导向钻进非开挖铺管施工扩回钻头的设计改进
16.
Improvement of steel workform construction for reinforced concrete wall
改进钢筋砼剪力墙结构大模板施工工艺的设想
17.
The Improvement of Cement Mixing Pile Construction Technology in Soft Clay in Central Shanxi
晋中地区软土中水泥土搅拌桩施工工艺的改进
18.
Improved Design of Carrying Project Control Method at Changqing Water and Power Supply Department;
长庆水电厂工程施工质量控制方案改进设计