The Technical and Economical Analysis of a Foshan Regional Power Plant s Energy-Saving Plan;
佛山地方电厂节能方案技术经济分析
2.
The engineering geological properties of soft soil in some power plant and the methods for foudation treatment
某电厂软土的工程地质性质及地基处理方案
3.
Ash is conveyed to the disposal point at power plants in various ways.
在发电厂粉灰通过不同的方式运送到处理地点。
4.
Study on Drainage Pollution Control of Yangbajing Geothermal Power Plant;
羊八井地热电厂排水污染控制方案研究
5.
Optimal Research for Subgrade Project of the Third Project of the Tongliao Power Plant;
通辽发电厂三期工程地基方案优化研究
6.
A Study on the Running Mode of Combined Heat and Power to Adapting Market Economy Rule;
地方热电厂适应市场经济规律的运行模式研究
7.
Optimal Research of Subgrade Project of the Third Project of Shajiao Firepower Plant;
沙角发电厂三期工程地基处理方案优化设计
8.
Regression Analysis and Fitting of Initial Geo-stress Field in Hydraulic Engineering and Application in Project
水电厂区地应力场反演分析方法及工程应用
9.
Introduction to plan for sea filling and ground treatment of Ningde Nuclear Power Plant
宁德核电厂填海工程及地基处理方案介绍
10.
Study on Ground Treatment Program for Phase Ⅱ of Thermal Power Plant in Guangzhou
广州某热电厂二期工程地基处理方案分析研究
11.
Cavern Excavation Method for Underground Powerhouse Complex at Xiangjiaba Hydropower Station
向家坝电站地下厂房系统洞室开挖方法
12.
Scheme of Seepage Control of Underground Powerhouse of Lianghekou Hydropower Station
两河口水电站地下厂房渗流控制布置方案研究
13.
A Processing Method of the Soft-soil Foundation in the Gain-land-from-the-sea project of a Power Plant in the Coastal Area of Fujian Province
福建沿海某发电厂围海工程软土地基处理方法
14.
3D parametric design method for underground powerhouse of hydropower engineering
水电工程地下主厂房三维参数化设计方法
15.
Karst Development Law and Treatment Measures of Foundation in Datang Power Plant,Linzhou
大唐林州热电厂岩溶发育规律及地基处理方案
16.
Study on Protection and Safety Automation Device Schemes of Dispersed Generatous
地方小电厂并网保护及安全自动装置配置方案探讨
17.
The Optimization of the Foundation Treatment Schemes of the Collapsible Loess Site of Large-scale Thermal Power Plant
大型火力发电厂湿陷性黄土场地地基处理方案的优化
18.
The electric plant is off limits.