说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 公伯峡
1.
Optimal Design on Gongboxia Hydro-Power Station Construction During Flood Perind;
公伯峡水电站施工度汛方案优化设计
2.
Investment control of the construction of the Gongboxia Hydropower Station project;
公伯峡水电站工程建设投资控制分析
3.
Consultancy and Study of Design of Huanghe River Bridge at Gongboxia Hydropower Station
公伯峡水电站黄河大桥设计咨询与研究
4.
Design and Construction Technology of Concrete Facing Rockfill Dam in the Gongboxia Hydropower Project;
公伯峡水电站混凝土面板堆石坝设计与施工
5.
Risk Analysis and Treatment of the Faceplate Rock Dam Construction in Gongboxia Power Station;
公伯峡面板堆石坝填筑施工风险分析及对策
6.
Analysis and Research on the Scheme of Right-bank Flood Discharge Grotto in GongBoXia Hydro-power Station;
公伯峡水电站右岸泄洪洞方案分析及研究
7.
Settlement Analysis of Gongboxia Face Slab Rock-fill Dam
公伯峡面板堆石坝坝体沉降变形规律分析
8.
Stress and Deformation Analysis Based on 3-Dimensional Finite Element Method for Gongboxia Rockfill Dam with Concrete Face Slab
公伯峡面板堆石坝三维应力变形有限元分析
9.
Experiment and Optimize Run for the Level Spiraling Flow Spillway Tunnel of Gongboxia;
公伯峡水平旋流式泄洪洞试验研究及运行方式的优化
10.
Influence of Crush Sidewall to the Stress and Deformation of Gongboxia Concrete Face Rockfill Dam;
挤压式边墙对公伯峡面板堆石坝应力和变形的影响分析
11.
On Face-plate Temperature Stresses and Shrinkage Stresses of Gongboxia Face Rockfill Dam;
公伯峡堆石坝面板温度应力及干缩应力问题研究
12.
Study on Relief of Excavation Slope of Fossil Weathered Rock and Anchor Measure of Gongboxia Hydroelectric Powerstation;
公伯峡水电站古风化岩边坡开挖松驰与锚固措施研究
13.
Improvement of PLC Control Program of 1~5 Main Transformer Cooling System on Gongboxia Hydropower Station
公伯峡水电站1~5号主变压器冷却PLC控制程序的完善
14.
Analysis of the Concrete Faceslab Deformation and Stress for Gongboxia Dam based on Measured Data Information
基于实测资料的公伯峡大坝面板变形及应力分析
15.
Structure Optimizing and Project Augmentation for Internal Dissipation Discharge Tunnel with Swirling Flow Reconstructed from Diversion Tunnel of Gongboxia Power Station;
公伯峡水电站导流洞改建为旋流式内消能泄洪洞的体型优化与方案比较研究
16.
The three imposing gorges--Qutang, Wuxia and Xiling Gorges---extend 193 kilometers.
壮丽的三峡包括瞿塘峡、巫峡和西陵峡,全长193 公里。
17.
Xiling Gorge, extending 66 kilometers in length,
西陵峡延绵66公里,
18.
The road goes through a gap in/between the hills.
公路从山间峡谷穿过.