说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 平垸行洪
1.
After the 1998 Flood, the Central Government developed a strategy of "leveling protective embankment to divert water, retreating the land to lakes, and building township for relocated people".
1998年大水后,我国实行了"平垸行洪、退田还湖、移民建镇"的治水战略。
2.
Effects of Sluicing Flood via Plain on Regional Land Use of Dongting Lake Region--Taking Yuanjiang City of Hunan as Example;
洞庭湖区平垸行洪对土地利用结构的影响——以湖南沅江市为例
3.
In over-cultivated lake areas. in line with local conditions, the embankments will be removed to help discharge flood water and return farmland to the lake.
对过度围垦的田地,要根据条件与可能,区别不同情况,逐步平垸行洪、退田还湖。
4.
Residents of the old flood-water discharge areas or flood-destroyed dyke-enclosed places are, in principle, not to move back.
原来行洪区和蓄洪垸的破垸受灾人口,不再返回原地。
5.
Research on Simulation of Diversion Flood Routing for Flood Storage in Dongting Lake Region;
洞庭湖区蓄洪垸分洪洪水演进模拟研究
6.
Huyuan agricultural and its substitutive patterns in Dongting Lake areas of returned field to lake
洞庭湖区的湖垸农业、洪涝灾害与退田还湖
7.
Residential quarters and small towns will be built on highlands and major dyke- enclosed places in flood-water discharge areas.
在分蓄洪区就近高地和重点垸年建设集中居民点和小城镇。
8.
THE SUGGESTION AND IMAGINE OF THE FOUNDING AN OBSERVATION STATION ABOUT DIKES STABILIY, LAKE BASIN EVOLUTION AND WATER-RELATED DISASTERS IN TONGTINGHU REGION;
建立洞庭湖区“垸坝稳定、湖盆演化及洪涝灾害观测站”的建议和设想
9.
Numerical Modeling for Draining Waterlogging
平原湖区排涝模拟研究——以大通湖垸为例
10.
Experiment and Optimize Run for the Level Spiraling Flow Spillway Tunnel of Gongboxia;
公伯峡水平旋流式泄洪洞试验研究及运行方式的优化
11.
Catastrophes such as fire, flood, drought or epidemic may reduce population sizes to a small fraction of their average level.
大灾难例如:火灾,洪水,干旱或流行病可能减少种群数量到他们平均水平的一小部分。
12.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响
13.
From 1998 Yangtze River Flood to Huaihe River Water Detention and Diversion
由1998年长江洪水对淮河行蓄洪区的思考
14.
The Plan Deliberation of Nanning Flood-control Works Sand River Dike Section Flood Prevention and Drains Waterlogged Land;
南宁防洪堤沙江堤段防洪排涝方案可行性研究
15.
The Evaluation of the Capacity of Flood Control of Water Intake Engineering and Flood Discharge of Watercourse of Ningxia Zhongning Electric Power Plant;
宁夏中宁电厂取水工程防洪及河道行洪评价
16.
Real-time flood forecasting for complex watershed with flood diversion and flood retarding areas
具有行蓄洪区的复杂水系实时洪水预报研究
17.
Efficient Eco-agriculture Modeling for Risk Zone Inside Embankment in Dongting Lake
洞庭湖垸内灾害风险区湖垸高效生态农业模式研究
18.
Study on the feasibility of dam-break flood insurance in China
中国实行溃坝洪水保险的可行性研究