说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 锦屏一级拱坝
1.
Simulation and Analysis of Temperature Control of Left Bank Concrete Pedestal of Jinping I Arch Dam
锦屏一级拱坝左岸混凝土垫座温控仿真分析
2.
Study on Jinping Ⅰ Arch Dam Left Abutment Foundation Treatment
锦屏一级拱坝左岸基础处理加固措施研究
3.
Study on Three-dimension Seepage and Abutment Stability of Jinping High Arch Dam;
锦屏一级高拱坝三维渗流场及坝肩稳定性研究
4.
Analysis on Stress and Deformation of Jinping I High Arch Dam
坝基加固后锦屏一级高拱坝应力变形计算分析
5.
Research on the seismic safety of high arch dam system of Jinping Project
锦屏一级水电站高拱坝整体抗震安全性研究
6.
The Study of the High Arch Dam Exceptionally Large Foundation Cushion Stability of Jinping 1 Hydropower Project
锦屏一级水电站高拱坝大垫座稳定性研究
7.
The Global Stability Safety Research of Jinping Grade One HydroPower Station Arch Dam Abutment Rock;
锦屏一级水电站拱坝坝肩岩体整体稳定安全度研究
8.
Stability Study of High Arch Dam Abutment of Jinping Ⅰ Hydro-power Station by Three-dimensional Geomechanics Breakage Model Test;
锦屏一级高拱坝坝肩稳定三维地质力学模型破坏试验研究
9.
Static and Dynamic Stability Analysis of Jinping High Arch Dam Abutment Using RBSM;
锦屏一级高拱坝坝肩动静力稳定性刚体弹簧元分析
10.
Analysis of Stability of Jinping High Arch-Dam Based on Nonlinear Finite Element Method;
基于非线性有限元法的锦屏一级高拱坝整体稳定分析
11.
Study on the Stability of the Spandrel Groove High Slope of Jinping Hydroelectric Power Station;
锦屏一级水电站拱肩槽边坡稳定性研究
12.
Analysis of Stability for the Right Spandrel Groove Slope of Jinping I Hydropower Station
锦屏一级水电站右岸拱肩槽边坡稳定性分析
13.
Study of the Problem about Hydrogeochemisty of Jingpin Hydroelectric Power Station;
锦屏一级水电站坝区水文地球化学问题研究
14.
Suppressing Measures Against Alkali-silica Reaction in the Dam Concrete for the Jinping-Ⅰ Hydroelectric Project
锦屏一级水电站大坝混凝土ASR抑制措施研究
15.
Presplit Blasting in Excavation of High Slope at Right Bank of Jinping I Hydropower Station
锦屏一级水电站大坝右岸高边坡预裂爆破施工
16.
Study on Working Condition during Construction Period and Integral Degree of Safety on JinPing Arch Dam
锦屏高拱坝施工期性态分析及整体安全度研究
17.
Analysis and Evaluation on Stability of Slope at Left Spandrel Groove of Jinping First Stage Hydropower Station in Construction
锦屏一级水电站左岸拱肩槽边坡施工期稳定性分析与评价
18.
Instability Mode and Stability Analysis of the Left Bank Head an Excavated Slope of Jinping Hydropower Station;
锦屏一级水电站左岸坝头开挖边坡失稳模式及稳定性分析