说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工缝留设
1.
Horizontal construction joint shall be set at the top of the slab.
5施工缝留设:水平施工缝留置于板顶面。
2.
Design and Construction of Crack Reinforcement Engineering in Cast-in-place Reinforced Concrete Plate
钢筋混凝土现浇板裂缝加固工程设计与施工
3.
The Design of Temporary Construction-Convenience Bridge for Liuxia to Wangjiapu Elevated Bridge
留下至汪家埠段高架桥施工便桥设计
4.
Discussing on Problems about Designing and Construction Technology of Static Shrinkage Method
静态留矿法设计与施工技术问题探讨
5.
The Construction Techniques for Paving Oversectior Seamless Track in Cold Area;
寒冷地区铺设跨区间无缝线路施工技术的研究
6.
Construction Technology of Overinternal Jointless Rail on Newly-Built Qin-Shen Passenger Railway;
秦沈客运专线一次性铺设无缝线路的施工技术
7.
Discussion on seamless design and comstruction skill of Ultra-Long water storage structure;
超长蓄水构筑物无缝设计与施工技术探讨
8.
Study on Construction Technique of Gapless Turnout Laying and Destressing
无缝道岔铺设与应力放散施工技术研究
9.
Construction Technology for New Continuity Laying of Inter-district Continuous Welded Rail
新线一次性铺设跨区间无缝线路施工技术
10.
Suggestion and Discussion on Construction Joint of Mass Concrete
大体积混凝土施工缝布设形式的探讨和建议
11.
On the setting of the expansion-reinforcing band in the over-long concrete structure jointless construction
超长混凝土结构无缝施工中膨胀加强带的设置
12.
Research on Construction Temperature and Cracks of Concrete During Engineering Construction of Glass Factory
玻璃工厂工程建设中混凝土的施工温度与裂缝研究
13.
The Presetting and Quality Assurance of Embedded Joint in High-rise Building
高层建筑后浇带的留设与施工过程质量控制
14.
No industrial or mining facilities not related to flood control may be constructed within the planned reserve zones.
  前款规划保留区内不得建设与防洪无关的工矿工程设施;
15.
The designer should consider the influence of construction joints and foundation joints on the shearing strength.
设计人员应该考虑施工缝和地基节理对剪切强度的影响。
16.
The key job in the establishment of regional modern surveying frame
区域现代高精度三维测绘基准设施无缝整合的关键工作
17.
Design and Quality Control of Rain Box Culvert Deformation Joint in Collapsible Soil Area
湿陷性土地区市政方涵变形缝设计及施工质量控制
18.
Primary Exploration on Control of TBM Segment Displacement under Construction in the Tunnel
TBM施工中管片接缝错台控制措施初探