说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 白沙水库
1.
One Dimensional Model of Reservoir Sedimentation and Its Application in Calculation for Water Intake of a Power Plant
白沙水库—维泥沙数学模型及电厂取水方案计算
2.
Status quo of the Fisheries in Wanan Reservoir and Baisha Reservoir and Development Countermeasures Analysis
万安水库和白沙水库渔业发展现状及对策措施
3.
Debris flow disaster and its controlling measures at Heishui Gully in the Baihetan reservoir area on the Jinsha River
金沙江白鹤滩库区黑水河泥石流及其防治对策
4.
Forecast of Inflow Hydrograph and Out Flow Sediment Concentration of Reservoir;
水库入库洪水预报与出库含沙量预测
5.
The Distribution of Fluorin in Space-Time and the Study on Indoor Simulation Experiment of Yangshapao Reservoir in Baicheng Jilin Province;
吉林省白城市洋沙泡水库氟分布规律及室内模拟实验研究
6.
Harbour Island Raw Water Pumping Station
白沙头洲原水抽水站
7.
The Influence on Deposition of the Three Gorges Reservoir Caused by the Construction of Reservoirs at Jinsha River
金沙江建库对三峡水库泥沙淤积的影响
8.
Harbour Island Raw Water Feed Tank
白沙头洲原水制潮涌缸
9.
Hammarus is a sandhopper dwelling in the fresh water reservoirs.
该种沙蚤是一种栖息于淡水水库中的沙蚤。
10.
Mathematical Model of Non-steady Water-sand Movable Bed of Sedimentation Reservoir
多沙水库非恒定水沙动床数学模型研究
11.
Research on the Relation between Operation Regulation and Sediment Deposition of Reservoir;
水库调度方式与水库泥沙淤积关系研究
12.
Study on storage capacity and characteristic water level for Qingcaosha Reservoir
青草沙避咸蓄淡水库库容与特征水位研究
13.
Effects of the Three Gorges Reservoir (TGR) Phase-Ⅰ Water Storage on the Yangtze River Sediment;
三峡水库一期蓄水对长江泥沙的影响
14.
Analysis on hydrological and sediment variation during impoundment stage of 156 m in TGP Reservoir Area
三峡库区156m蓄水水文泥沙变化分析
15.
Research on Entironment and Discharge to Dazhai Gully and Haizi Gully Debris Flows in Baihetan Reservior Area, Jinsha River;
金沙江白鹤滩水电站库区大寨沟、海子沟流域泥石流形成环境与流量研究
16.
Study on the settling rate of suspended sediments for the Chenhang Reservoir in the Yangtze Estuary
上海长江口陈行水库泥沙沉降率研究
17.
Joint Economic Dispatching of Cascade Reservoirs in Shaxi Reservoir Basin
沙溪流域梯级水库联合经济调度运作
18.
Shape optimization test of Dabeigou spillway reservior desilting tunnel
大北沟水库泄洪排沙洞体型优化试验