1.
Abstract: The articles introduce the method of China and Germany; according to their conditions of natural geography environment and technique etc, to determine crest the elevation of earth dam.
文章介绍我国及德国根据自然环境、术条件采用的确定土坝坝顶高程的方法。
2.
Villagers are scrambling to pile sandbags onto the top of the dyke to raise it higher.
村民们正急匆匆地在坝顶堆积沙袋以加高堤坝。
3.
Study on thrust angles of high arch dam abutment during overloading
超载过程中高拱坝坝肩推力角的研究
4.
The deformation process curve of the Wanjiazhai dam crest exhibits many peaks.
万家寨大坝坝顶各监测点的变形过程是多峰曲线。
5.
Water power schemes (hydroelectric schemes) are of two types, high dams and low dams
水力发电工程(水电工程)有高坝和低坝两种类型。
6.
Treatment for Cracks in Existing Dam Body during Heightening of Danjiangkou Dam
丹江口大坝加高工程中原坝体裂缝处理工艺
7.
Study on Reinforcement Technology of Earth-Rock Dam of Danjiangkou
丹江口大坝加高工程左岸土石坝加固技术研究
8.
Approach To Random Simulation Methed about Construction Process of High Earth Rockfill Dams
高土石坝施工过程随机模拟方法探讨
9.
Xiaolangdi Dam project on the Yellow River is 154 meters high.
黄河小小浪底大坝工程有154米高。
10.
Study on Effects of Construction Proccess and Crack Inducor at the Upstream Base of High Arch Dam;
施工过程及底缝对高拱坝的影响研究
11.
"The dam is 726 ft (221 m) high and 1,244 ft (379 m) long (along the crest) has a power capacity of 1,345 megawatts, and a volume of 4.4 million cu yd (3.36 million cu m). "
"坝高221公尺,顶长379公尺,发电功率1,345兆瓦,蓄水量336万立方公尺。"
12.
Research on Tailrace System of Tunnel with Sloping Ceiling in Right Bank Underground Hydropower Station;
金沙江向家坝水电站右岸地下电站变顶高尾水系统研究
13.
Damage of guardrails on crest of Zipingpu CFRD in Wenchuan earthquake and its enlightenment
紫坪铺大坝坝顶护栏震损情况及启示
14.
Analysis on Vertical Displacement Monitoring Data of Jicun Dam Crest
纪村大坝坝顶垂直位移监测资料分析
15.
Engineerng Measures for Increasing Stability against Sliding along the Base of Concrete Gravity Dams on Rock Foundation
提高岩基混凝土重力坝沿坝底抗滑稳定性的工程措施
16.
Researches in the Influence of Foundation Excavation on Engineering Properties of Foundation Rock in High Arch Dam;
高拱坝坝基开挖对建基岩体工程特性影响的研究
17.
The deformation monitoring items of the dam for Shanxi Hydropower Station include the elevation control network close to the dam area, plane control network of triangulation and trilateral, dam collimation line and settlement monitoring.
珊溪水电站大坝变形监测项目包括近坝区高程控制网和平面边角控制网、坝视准线及沉陷观测。
18.
The selection of seepage control route for two banks of GHP and its optimal design of curtain grouting
高坝洲工程基坑岩溶漏水通道堵漏灌浆技术