说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 油田调整
1.
Study on Adjustment Technique of Pressure Profile of Wells Drilling in Daqing Oilfield;
大庆油田调整井油层压力剖面调整技术研究
2.
Research on the Drilling-shut Design of the Especially Low Permeability Oil-field;
特低渗透性油田调整井钻关措施研究
3.
The Study on the Remaining Oil Monitor of the ZhenWu Oilfield and on Its Development Adjustment and Potential Tapping;
真武油田剩余油监测与调整挖潜研究
4.
A STUDY OF HIGH EFFECTIVE ADJUSTMENT WELLS AT LATERPERIOD OF HIGH WATER CUT STAGE IN DAQING OIL FIELD
大庆油田高含水后期高效调整井研究
5.
The Research of Integrated Adjustment Method of Injection Production System in Xinzhan Oilfield
新站油田注采系统综合调整方法研究
6.
Evolution of Energy Usage Adjustment in American Kern River Oil Field and the Illumination for the Self-used Oil Substitution in Chinese Oil Field
美国克恩河油田用能结构调整对中国油田自用油替代的启发
7.
The Research on the Whole Shallow Profile Adjustment for Water Flooding Process in Lamadian Oil Field;
喇嘛甸油田水驱油层整体浅调剖技术研究
8.
Infilling Adjustment Research of Narrow Sand Comprehensive and Thin Oil Layer in Shengping Oil Field;
升平油田窄砂体、薄油层加密调整技术研究
9.
Study on Development Adjustment of Triassic Reservoir in Tahe Oilfield in Tarim Basin;
塔里木盆地塔河油田三叠系油藏开发调整研究
10.
Research on Daqing Peripheral Oilfields Water Flooding Development Comprehensive Adjustment Technology
大庆外围油田注水开发综合调整技术研究
11.
ADJUSTMENT OF PRODUCTIVE SERIES IN DAQING OIL FIELD DURING PERIOD OF HIGH WATER-CUT
大庆油田高含水期层系调整的几个问题
12.
A Study on Further Water Flooding after Polymer Solution Slug for Eastnorth Area of Lamadian Oilfield;
喇嘛甸油田北东块后续水驱调整方法研究
13.
Optimization Method Study for Compositive Adjusting Measures in Oil Field during High Water-cut Stage;
油田高含水期综合调整措施优化方法研究
14.
Studying on the Technology Adjustment to the Water-Flood Effect for Lamadian Oilfield's High Water-Cut Stage;
喇嘛甸油田特高含水期水驱综合调整技术研究
15.
The Overall Adjustment Technology Study of of Sazhong Oil Field for High Water Cut;
萨中油田高含水后期开发趋势及调整技术研究
16.
Tertiary Infilling Adjustment in Lasaxing Oilfields, Daqing;
大庆喇萨杏油田三次加密调整技术研究
17.
Economic evaluation and decision method of oilfield development adjusting project;
油田开发调整项目的经济评价与决策方法
18.
On integrated adjustment measure and effect in Mian14 Area of Bamianhe Oilfield;
八面河油田面14区的综合调整措施及效果