说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 泄洪布置
1.
The study of the thin-arch-dam layout for flood spillway and the effect of energy dissipation
薄拱坝坝身泄洪布置及消能效果的研究
2.
Study on Changheba Hydropower Station Flood Discharging Works Layout
长河坝水电站泄洪建筑物的布置研究
3.
Optimization for Layout of Flood-release Structures and Energy-dissipators for High Arch Dams;
高拱坝坝身泄洪与消能建筑物的优化布置
4.
Numerical study on hydraulic characteristic of free surface flow in spillway tunnel with different configuration
明流泄洪洞布置形式对水力特性影响的数值研究
5.
Layout and storage-routing method of the weir-gateway combination of the spillway
溢洪道闸堰结合的布置与洪水调节方法
6.
Influence of Atomized Rain of Shuibuya Hydraulic Power Project on Groundwater Distribution of Dayantang Landslide
泄洪雾化降雨对水布垭大岩淌滑坡地下水分布的影响研究
7.
Study of General Layout of Linghuaigang Complex and Discharging Capability;
临淮岗枢纽总体布置及泄流能力研究
8.
Application of Gray System Theory in Discharge Tunnel Schedule Control at Pubugou Hydropower Station;
灰色系统理论在瀑布沟水电站泄洪洞工程进度控制中的运用
9.
Deformation and Stability Analysis of Outlet Section of the Discharge Tunnel of Pubuguo Hydropower Station;
瀑布沟水电站泄洪洞出口段开挖变形及稳定性非线性有限元分析
10.
Study on the layout pattern of new spillway structure of Tianqiao hydropower station
天桥水电站新增泄水建筑物布置型式研究
11.
Research Flood Releasing Safety of Flood Discharge Structure with High-head & Large-discharge
高水头大流量泄洪建筑物的泄洪安全研究
12.
Discussion on discharge capacity calculations of drainage system of tailing ponds
某尾矿库排洪系统泄洪能力计算探讨
13.
Model Experiment Research on Release Works Arrangement and Energy Dissipation and Sour Prevention of Xihe Hydropower Station;
喜河水电站泄水建筑物布置及其消能防冲模型试验研究
14.
Study on Indexes System of Risk Analyis of Discharge Structures and Flood Discharge Calculation Based on Concrete Dam;
基于混凝土大坝的泄洪建筑物风险指标体系及泄洪风险研究
15.
In the effort to control and prevent floods, the principles of attaching equal importance to enhancing flood-water storage and discharge capacity, with the emphasis on the latter, should be carried out.
防止洪涝灾害要贯彻蓄泄兼筹,以泄为主的方针。
16.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响
17.
The spillway cannot be blocked, otherwise it will cause a serious problem.
不能堵塞泄洪道, 否则后果不堪设想。
18.
Aseismatic Analysis and Optimization Design for Inlet of Diversion Tunnel;
导流泄洪底洞进口段抗震及优化分析