说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 沉管桩
1.
Analysis on Bearing Capacity of Prestressed Concrete Pipe Pile, Pipe-drived Pile, Bored Pile;
软土中管桩、沉管桩、钻孔桩承载力的分析
2.
The Hammering Resistance of Buffeting Pipe-Sunk Piles and its Affection to the Design and Construction;
振动沉管桩贯入阻力对设计、施工的影响
3.
Research on Excess Pore Water Pressure Which is Induced by Jacking of PHC Pile;
PHC管桩沉桩引起的超孔隙水压力研究
4.
The problem of the soil consolidation after tube-pile driving was studied.
研究了黏弹性土中管桩沉桩后的固结问题.
5.
Deep Tube Perfusion Quality Control in High Buildings
高层建筑中沉管灌注桩桩基的质量控制
6.
Study on Prestressed Concrete Pipe Pile and Compaction Effect of Pile Driving;
预应力混凝土管桩及其沉桩挤土效应研究
7.
Construction Technology and Application of Ram - expanded Pile;
沉管扩底桩桩基技术在惠州地区的应用
8.
Study on Installation Mechanism and Calculation Method for Bearing Capacity of Concrete Pipe Pile
混凝土管桩沉桩机理和承载力计算方法研究
9.
Experiments of Driven Pile Control for Static Pressure on PHC Pipe Pile
静压式预应力高强度混凝土管桩沉桩控制压桩力的试验分析
10.
Research on the Compacting Effects and Settlement Analysis of Y-shaped Tube-sinking Cast-in-situ Pile;
Y形沉管灌注桩挤土效应和沉降分析研究
11.
Vibrator-tube Sinking Bored Pile Construction and Project Management Measures;
振动沉管灌注桩施工与监理控制措施
12.
Immersed tube vibration in the soft gravel pile Application
振动沉管碎石桩在软土地基中的应用
13.
Load-testing analysis of vibro-sinking pipe cast-in-place piles at Xishahe residential area, Anshan City
鞍山西沙河住宅小区振动沉管灌注桩桩载试验分析
14.
Theoretical Estimation and Numerical Analysis on the Penetrating Resistance of Jacked-in PHC Pipe Pile in the Songhua River Floodplain Areas
松花江漫滩地区静压PHC管桩沉桩阻力理论估算与数值分析
15.
Analysis on deformation and vibration of seawall caused by pipe pile driving for construction of wind turbine foundation in Xiangshui Wind Farm
响水风电场风机基础管桩沉桩引起的海堤变形及振动分析
16.
Measuring analysis on pore pressure of saturated soft clay ground in the sinking of pipe piles
管桩沉桩过程中饱和软粘土地基孔压变化实测分析
17.
THE APPLICATION OF FILLING PILES WITH LARGE DIAMETER SINK-PIPE IN THE LONGJING BUILDING
大直径沉管灌注桩在龙景大厦工程中的应用
18.
Application of Vibration Cast-in-place Concrete Thin-walled Pipe Pile to Mollisol Ground
振动沉模现浇混凝土薄壁管桩处理软土地基