说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 部分工况
1.
Simulating Research on Gas Turbine and Its Combined Cycle in Part Load
燃气轮机及燃气—蒸汽联合循环在部分工况下的仿真研究
2.
weighting method based on internal staff distribution patterns
以内部工作人员分布情况为依据的加权法
3.
General Production and Technology Situation of Partial Rubber Goods in Russian
俄罗斯部分橡胶工业制品生产技术概况
4.
Analysis of the State of Political Work Cadres Thoughts and its Countermeasures in the New Situation;
新形势下政工干部思想状况分析及对策
5.
The Investigation of Low Side Blood Routine of the Female Workers in some Factones in Jiaozhou City in 2005;
2005年胶州市部分企业女工苯危害状况调查
6.
Analysis of Non-normal Operation Condition of the Top of 10 Million Tons Atmospheric Distillation Tower
1000万吨常压蒸馏塔顶部非正常工况的分析
7.
The quantity schedule, a section in the cost of production report, is the vehicles used to show physical flow.
生产数据汇总中的数量部分是分析产品实际流动情况的有利工具。
8.
A Study of the Health Status and Influencing Factors in a Part of Workers Occupational Exposed to Radiation in Hunan Province;
湖南省部分放射工作人员的健康状况与影响因素研究
9.
Psychoanalysis of Enterprise Political Work Personnel at Present and the Countermeasures;
当前企业政工干部队伍心理状况分析及对策研究
10.
Investigation on Health Status of Employed Workers in Private-owned Coal Mine in Midu County in 2008
2008年弥渡县部分个体私营小煤矿在岗工人健康状况调查
11.
Part of Comrade Mao Tsetung's instructions when the departments concerned under the State Council reported their work on handicrafts.
这是毛泽东同志在国务院有关部门汇报手工业工作情况时所作指示的一部分。
12.
I am wholly/partly responsible for the confusion.
我对此混乱情况负有全部[部分]责任.
13.
The figure shows the product's operation. The dotted line in the figure shows the situation of the grounding part's disconnection while the disconnector operation.
脱离器的工作情况见此图。图中虚线表示的就是脱离动作后,接地部分断工的情形。
14.
British manufacturing would be in a better state today if the captains of industry had reinvested some of their profits in new factories and machines.
如果实业巨头把他们的一部分利润再投资于新工厂和新机器,英国工业今天的境况会更好些。
15.
On Rethink about the Enrollment of Higher Vocational Institutes--A Research Report about the Enrollment of Some Higher Vocational Institutes;
高职院校招生工作的再思考——对部分高职院校招生工作情况的调研报告
16.
Manage the working hours and working attitude of employees in department.
掌握本部门员工的工时情况及工作态度。
17.
Through analyse on cooling path of motor, distribution of wind scalar, wind speed and pressure difference of a motor operating at the ratings is obtained.
通过对电机冷却风道进行分析研究,得到电机在额定工况下,电机内部风量分布、速值和压差。
18.
all about your first full day back on the job.
关于你重回工作第一天的全部情况了。