1.
Precasting and Installation of the Double-Track Simply Supported Monolithic Box Beams of High-Speed Railroad;
高速铁路双线整孔简支箱梁的预制和安装
2.
Construction technology of the shallow two ways railway tunnel in city building dense area
城市建筑密集区浅埋铁路双线隧道的施工工法
3.
Application of the Construction of Double-line and Large Span Railway Tunnel with the Method of CRD
CRD法在双线大跨铁路隧道中的应用
4.
Probe into the Technology to Construct Iron Tower for 750kV Pingqian Double Transmission Line
750kV平乾线双回路铁塔施工工艺的探讨
5.
railroad overbridge
铁路跨线桥(铁路线在上)
6.
Construction Technology of Steel-concrete Continuous Beam in Railway Passenger Line
铁路客运专线钢-混连续结合梁(双线)施工技术
7.
Construction technology of railway passenger dedicated line two-hole box full of prefabricated
铁路客运专线双线整孔箱梁预制施工技术
8.
north--south rail corridor [Jing--Jiu Line]
南北铁路干线〔京九铁路〕
9.
Transient response of high voltage transmission lines with self-supporting double-loop steel towers in the case of cable rupture
自立式双回路铁塔送电线路导线断裂后的结构动响应分析
10.
Study on Construction Technology of the Soft Rock Tunnel Passing Througy Existing Railway;
穿越既有铁路的软弱围岩双线隧道施工技术
11.
The Limits for Installing Mechanical Ventilation in Railway Double Track Tunnels on Diesel Traction Lines;
内燃牵引双线铁路隧道设置机械通风的界限
12.
Study on the Train Operation Adjustment on Double-track Line Based on Ant Colony Algorithm;
基于蚁群算法的双线铁路列车运行调整研究
13.
Evaluation of Reserved Double Line Project based on Real Option Method;
基于实物期权方法的铁路预留双线项目评估
14.
An Improvement on the Construction Process of Double-tracked–Single Bore Long Tunnel
新建铁路长大隧道“单洞双线轨道运输”工序改良
15.
Practice of Live Working on New Towers Erection under 10 kV Double Distribution Lines
10kV带电双回配电线路下新立铁塔的实践
16.
Application of overall elevation scheme of 220 kV straight tower with double circuits
220kV双回路直线铁塔带电整体升高方案实施
17.
A Study on Increasing the Carrying Capacity in Unidirection Simultaneously of the Complex Track Railway of Port
港口铁路区间双线同时同向运行通过能力研究
18.
Cause analysis of mass concrete crack of double-track railway abutment
双线铁路桥台大体积混凝土裂缝成因分析