1.
Food Carrying Capacity and Characteristic Flow(water level) of the Middle and Lower Reaches of Weihe River in 2009
渭河中下游2009年过洪能力及特征流量(水位)分析
2.
Forecast of Dam Pier s Ability to Get Across Ice Sheet and Study of Icebreaker Project;
泄洪闸墩过冰能力预测与破冰方案研究
3.
But can you traverse the stream?
可是,你能闯过那车的洪流、人的洪流吗?
4.
They could not cross the river owing to the flood.
由于洪水,他们不能过河。
5.
Discussion on discharge capacity calculations of drainage system of tailing ponds
某尾矿库排洪系统泄洪能力计算探讨
6.
Research on flood forecast operation model based on the classification of flood diversion capacity of downstream reaches
基于下游河道过流能力分级的水库洪水预报调度方式研究
7.
Do better pressure cementing and strengthen anti-flood capacity of channel embankment
做好压力灌浆 增强河道堤防抗洪能力
8.
The train failed to get through because of the floods
由于洪水(拦路),火车未能通过。
9.
Research on Flood Control Forecast Operation Taking into Account the Human Activity Impact and the Uncertainty of River Conveyance Capacity;
考虑人类活动影响及河道过流能力不确定性的洪水预报及调度研究
10.
China Improves Major Rivers' Flood-Control Capacity
中国大江大河防洪能力全面提高
11.
Strengthening Comprehensive Administration for Slopping Fields and Increasing Flood protection Capability of the Changjiang River
加强坡地综合整治 增强长江防洪能力
12.
Research on the Character of Rainstorm and the Ability of Flood Routing about Main Haihe River in Tianjin;
天津市海河干流暴雨洪水特征及行洪能力的研究
13.
Construction of the ecological environment and water conservancy projects will also be carried out gradually after the floods, so as to enhance the flood- storage, discharge and control capacity.
灾后生态环境建设和水利基础设施建设也将陆续展开,提高蓄洪、行洪、抗洪能力。
14.
The government tried its best to ease the sufferings of the people after the flood.
洪水过后,政府尽最大的努力减轻人民的痛苦.
15.
I did a flood once, and behold, I can do viruses.
我曾经发过一场洪水,记住,我也能制造病毒。
16.
The deposition of sediment in channels decreases the channel capacity and the flood-carrying capacity.
泥沙淤积在河道内,减少了河槽容量和泄洪能力。
17.
Constructing tributary-control projects and expanding the flood-discharge capacity of the lower- middle streams of major rivers.
建设干支流控制工程,扩大中下游行洪能力。
18.
Influences from Reclamation Projects in ShenZhen HouHai Bays on Discharging Capacities of Rivers;
深圳后海湾填海工程对泄洪能力的影响研究