说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 太平驿水电站
1.
Furthermore, total energy release of surrounding rockmass obtained by LERR can be used as optimal index for optimal design of excavation schemes.
太平驿水电站引水隧洞工程不同开挖步长下能量释放率指标的算例进行分析。
2.
Analysis of cracks on cement poles of Taipingwan hydropower station and its reinforcement
太平湾电站变电站水泥杆裂缝分析及加固
3.
Influence of Pushihe flood to tail water level of taipingwan hydropower station
蒲石河洪水对太平湾水电站尾水位的影响
4.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响
5.
The Quality Control of Concrete Construction Engineering of Head Junction Project at Taiping River Hydropower Station
太平江水电站首部枢纽混凝土施工质量控制
6.
High Pressure Jet Grouting and Anti-seepage Engineering at Cofferdam of Power House at Taipingjiang Hydropower Station
太平江水电站厂房围堰高压旋喷防渗施工
7.
Construction and application of automatic water regime system at Taipingwan hydropower station
太平湾电站水情测报自动化系统的建设与应用
8.
Happiness is a way station between too little and too much. --Channing Pollock
幸福是在太少和太多之间的驿站。——波洛克
9.
Analysis on tailrace sedimentation after flood discharge and power loss at Taipingwan hydropower station
太平湾电站泄洪后尾水渠淤积与电能损失的分析
10.
It was hard by the fountain, and the peasants suspended their operations to look at him.
驿站就在泉水边不远,农民们停下活儿望着他;
11.
Application of Mine Transient Electromagnetic Method to Water Prospection of Xinyi Mine
矿井瞬变电磁法在新驿煤矿探水中的应用
12.
The Applications of Water-prospecting by Electrical Method in Pingguo Substations
电测深法在平果变电站找水中的应用
13.
At that time it was customary to carry convicts down to the dockyards by stage-coach.
当年驿站上的马车,照例都要带几个押送到水牢船上去的囚犯。
14.
a road agent
(驿站道路的)拦路强盗
15.
The people in the coach got off at the next stage,when the horses were changed.
乘驿站马车的人在下一个驿站换马时下了车。
16.
Optimization of Hydropower Tunnel Upper Flat Pipe Section Support for Hydropower Station
水电站引水发电隧洞上平管段支护优化研究
17.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
18.
Experimental investigation of the side wall deformation in the PCP region of a utility boiler
电站锅炉水平侧包墙变形的试验研究