说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 河道洪水预报
1.
Application of Neural Network in Channel Flow Forecasting
神经网络理论在河道洪水预报中的应用
2.
Study on ANN Model Application in Middle and Lower Reaches of Yangtze River;
人工神经网络模型在长江中下游河道洪水预报中的应用研究
3.
Study on Method of Real-time Flood Forecasting of Braided River and Its Application;
分汊河道实时洪水预报方法研究及应用
4.
Research on flood forecast operation model based on the classification of flood diversion capacity of downstream reaches
基于下游河道过流能力分级的水库洪水预报调度方式研究
5.
Flood Forecasting and Regulating Model of Qinhuai River Catchment;
秦淮河流域洪水预报与调度模型研究
6.
Study on Process or Volume Control in Reservoir Operation and Forecasted Flood Operation Rule for Biliuhe Reservoir;
水库洪水调度峰量控制类型与碧流河水库防洪预报调度规则研究
7.
Research on Flood Forecasting and Analysis of Effects of Water and Soil Conservation on Floods for Yanan Water Basin;
延河洪水预报研究及水土保持对洪水的影响分析
8.
The Theory and Practice of the Flood Forecast Programme of the Wenyuhe Researvoir Shanxi Province;
山西省文峪河水库洪水预报方法的理论与实践
9.
Study on the Method of Real-time Flood Forecast for Sujiahekou Hydropower Project
苏家河口水电站洪水实时预报方法研究
10.
Study on ANN models for flood forecasting in lower reach of the Wei River
渭河下游洪水预报的人工神经网络模型研究
11.
A Multivariate Regression Model Research for Flood-peak Stage Forecasting on Lower Yellow River;
黄河下游洪峰水位预报多元回归方法研究
12.
Development and Application Research of Flood Forcasting Model in Lower Reaches of WeiHe Basin;
渭河下游洪水预报模型开发及应用研究
13.
The Change of the Mid-Downstream Bed-Downcutting in Xijiang River and the Improved Research of Flood Forecasting;
西江中、下游河床下切变化及洪水预报改进研究
14.
Study on Hydro-meteorological Forecasting Model of Flood Caused by Torrential Rain in Plain River Network Region
平原河网区暴雨致洪的水文气象预报模型研究
15.
Application of Correction Technique by Autoregressive Model with Memory Attenuated RLS Algorithm on Flood Forecasting of a River Network
河网洪水预报的衰减二乘自回归校正应用
16.
Research on Flood Control Forecast Operation Taking into Account the Human Activity Impact and the Uncertainty of River Conveyance Capacity;
考虑人类活动影响及河道过流能力不确定性的洪水预报及调度研究
17.
The riverbed is silted up, so there's no outlet for the floodwater.
河道淤塞,洪水无出路。
18.
A Dynamic Numerical Method for Prediction of Flooding Process Height in Tidal Rivers and its Application (Ⅱ)
有潮河段洪水过程水位的动力数值预报方法及其应用(Ⅱ)