说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 清江水布垭水电站
1.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
2.
Analyzing stator windings main protection of generator for Qingjiang Shuibuya hydropower station
清江水布垭电站发电机定子绕组主保护分析
3.
Regulation quality parameter test technology of 460MW unit in Shuibuya Hydropower Station
清江水布垭电站460MW机组调节品质参数测试技术
4.
The PLC Controlling of the 500 kV Main Transformer Wind Cooling System in Shuibuya Hydropower Station in Qingjiang
清江水布垭电站500kV主变风冷系统PLC控制
5.
Analysis of Problems and Defects of Electric Equipment of NO.2 Unit in Shuibuya Hydropower Station
清江公司水布垭水电站2号机组设备缺陷问题及分析
6.
Electric braking in application to generating sets of Qingjiang Shuibuya Hydropower Plant
电气制动在清江水布垭电厂发电机组的应用
7.
A Feasibility Study of Hubei Qingjiang Shui Bu Ya Hydro-hinge;
湖北清江水布垭水利枢纽可行性研究
8.
Shuibuya Hydropower Project is the first step of cascade development on Qingjiang River . The project is located across the border between BaDong county EnShi State and ChangYang County of YiChang City.
水布垭枢纽工程是清江梯级开发的龙头电站,工程占地跨恩施州巴东县和宜昌市长阳县两县。
9.
Failure Mechanism of Muzhuping Landslide in Shuibuya Reservoir Area,Qingjiang River
清江水布垭库岸木竹坪滑坡失稳探讨
10.
STUDIES ON ENVIRONMENTAL CAPACITY OF THE SETTLEMENT AREA IN THE REGION OF SHUIBUYA RESERVOIR ON THE QINGJIANG RIVER;
清江水布垭水库农村移民安置区环境容量研究
11.
Treatment on oil throw fault in lower guide bearing of generator of Shuibuya Hydropower Plant
水布垭水电站发电机下导轴承甩油问题处置
12.
Final archives management of Shuibuya Hydropower Project;
水布垭水电站工程竣工档案的管理工作
13.
Practice of disperse-resettlement for Shuibuya Hydropower Station;
水布垭水电站库区移民分散安置的实践
14.
Key technology for construction of anti-scour wall by shaft method on the left bank of Shuibuya hydropower station
水布垭水电站左岸防淘墙竖井法施工关键技术
15.
Earthwork Design for Cubic Meter of Earth and Stone in Qingjiang Rockfill Dam Construction;
清江水布垭面板堆石坝动态土石方平衡设计
16.
Closed-type Management & Vehicle Auto-distinguishing System at Construction Site of Shuibuya Hydro-project;
清江水布垭工区封闭管理和车辆自动识别系统
17.
Difficult operating status of flood control type waterpower plants and its countermeasures;
防洪型水力发电企业的经营困境及对策——以江垭水电站为例
18.
Analysis of Excavation Construction and Dynamic Response on the Shuibuya Power Station Tunnel;
水布垭电站尾水隧洞施工过程分析与爆破动力研究