1.
On technical regulation for DBJ 04-273-2009 prestressed concrete pile foundation
DBJ 04-273-2009预应力混凝土管桩建筑桩基技术规程
2.
Researches on the Settlement of Pile Foundation in Wenling Soft Ground;
温岭软土地区建筑桩基沉降规律研究
3.
The Analysis of the Influence about Piles around to Metro Tunnel;
周边建筑桩基对地铁隧道的影响分析
4.
Application of Post Grouting Technology to Bored Pile Bottom in Pile Foundation of High-Rise Building
钻孔灌注桩桩底后注浆技术在高层建筑桩基中的应用分析
5.
Post Grouting Technology for Bored Pile Applied to Pile Foundation Engineering of Super Tall Building
灌注桩后注浆技术在超高层建筑桩基工程中的应用
6.
Application of Post-grouting Pile Tip Construction Technology to Pile Foundation Project of High-rise Building
桩端后压浆施工技术在高层建筑桩基工程中的应用
7.
THE DESIGN OF PILE CAPS OF HIGH-RISING BUILDING
高层建筑桩基承台按应力图形配筋的设计方法
8.
Calculation and Research of Piles Foundation Settlement in High Buildings;
杭州地区高层建筑桩基础沉降计算研究及应用
9.
Deep Tube Perfusion Quality Control in High Buildings
高层建筑中沉管灌注桩桩基的质量控制
10.
Vibro Replacement Stone Column and Artificial Drilled Piles Used to Reinforce the Soft Soil Foundation of Buildings;
振冲碎石桩与人工挖孔桩加固建筑软基
11.
Study of Caculating of Piled-raft in High Buidingbined;
高层建筑中桩筏基础计算分析及研究
12.
Application of Steel-Pipe Pile in Foundation Underpinning for Existing Buildings
钢管桩在既有建筑基础托换中的应用
13.
Piling on the Impact Analysis of Buildings in the Sandy Soil
砂土地基中打桩对建筑物的影响分析
14.
The Design and Analysis of Some Small High-Rise Construction Hard and Soft Compound Pile Foundation
某小高层建筑刚柔复合桩基设计分析
15.
Cement-fly ash-gravel pillar composite foundation applied to industrial buildings
CFG桩复合地基在工业建筑中的应用
16.
Quality Control of Pile Foundation Construction Surveying in Construction Engineering
建筑工程桩基础施工测量的质量控制
17.
Study on Interaction Mechanism of Structure-raft Foundationsoil of High-rise Buildings;
高层建筑结构—桩筏基础—地基共同作用机理研究
18.
STUDY ON REINFORCING ADDITIONAL BUILDING FOUNDATION WITH RIGID-FLEXIBLE PILES
刚-柔性桩复合地基处理加层建筑物地基