说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水平埋设
1.
As a result of these concerns, it is common practice for substations to have an electrical ground system consisting of a gird of horizontal and buried conductors.
由此考虑,变电站通常的做法是采用由水平埋设导体构成的电气接地系统。
2.
Experimental Research on Ground Source Heat Pump with Horizontal Buried Pipes Heat Exchanger in Summer Cooling and Winter Heating;
水平埋管换热器地热源热泵实验研究
3.
Heat transfer performance and temperature field of soil around horizontal buried heat exchangers for ground-coupled heat pump system
地埋管地源热泵水平埋管冬夏季工况换热性能及土壤温度场
4.
Installing Analysis of Burying Part of Turbine in Hydrodynamic-power Station;
小型水电站水轮机埋设部件的安装分析
5.
Only by keeping one's nose to the grindstone can one hope to improve one's standard of living.
只有埋头苦干才能有希望提高生活水平。
6.
Investigation on Heat Transfer of the Horizontal Heat Exchanger Used in Ground Source Heat Pump Systems;
地源热泵水平埋管地下传热性能与实验研究
7.
Numerical simulation of moisture balance in evapotranspiration landfill cover
垃圾填埋场ET封顶系统水分平衡数值分析
8.
The Verification of FAO56 in Shallow Groundwater Field in the Northwest Plain of Shandong Province,China
FAO56在鲁西北平原地下水浅埋区的试验验证
9.
A study of the stability of a deep-buried hardrock tunnel with low horizontal ground stress
深埋低水平地应力硬质岩隧道稳定性研究
10.
The Response of Shallow Water Table Depths to Climate Change in Huang-Huai-Hai Plain
黄淮海平原浅层地下水埋深对气候变化响应
11.
The U. S. Pacific Fleet commander established an ambush, waiting for the Japanese.
美国太平洋舰队司令设下埋伏,等待日军的到来。
12.
Design on Leachate Treatment Process in Pingshun Household Waste Landfill Site
平顺县生活垃圾填埋场渗沥液处理工艺设计
13.
CONSISTENT MODEL OF TRANSLATIONAL FAILURE ANALYSIS OF SANITARY LANDFILLS WITH REFUSE DAM
设垃圾坝卫生填埋场平移破坏的统一分析模型
14.
Discussion on the Groundwater Depth of the Optimal Groundwater System Vulnerability in Hufu Plain
滹滏平原地下水系统脆弱性最佳地下水水位埋深探讨
15.
Design and Calculated Analysis on Buried Branch Pipe of High Water Head Large PD Value;
高水头大PD值埋藏式岔管设计及计算分析
16.
Structural analysis of different embedding types of spiral case in large-scale hydropower station
大型水电站不同埋设方式蜗壳结构分析
17.
Embedment of spiral cases of 700MW hydro-generator set Three Gorges Hydropower Plant(Ⅲ-phase)
三峡三期水电厂700MW机组蜗壳埋设施工技术
18.
recommended techniques for the installation of unplasticized poly(viny chloride) (pvc-u) buried drains and sewers
对安装埋设式未增塑的聚乙烯(pvc-u)排水管和下水道的推荐技术