说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 延期索
1.
Claim on delayed shipment is that sellers fail to make the deliery according to time schedule.
延期索赔是对卖方没有按时装运货物而提出的索赔。
2.
Claim on delayed shipment is that sellers fail to make the delivery according to time schedule.
延期索赔是对卖方没有按时装运货物而提出的索赔
3.
STUDY ON THE PRINCIPLE OF DELAY CLAIMS WITH MULTI-EVENT INTERFERENCE;
多事件干扰下工期延误索赔原则研究
4.
Analysis of Clients'Counter Claim Because of Project Delay
工期延误引起的业主反索赔分析初探
5.
Due to your excessive delay in delivery, we have to file a claim against you .
由于贵公司交货延期过长,我们不得不提出索赔。
6.
Expense Claim for Construction Delay of International Water Conservancy Project;
关于国际水利工程工期延误的费用索赔浅析
7.
A Probe into the Democratic Politics in Border Areas of Shaanxi,Gansu and Ningxia
延安时期陕甘宁边区民主政治试验探索
8.
We request to extend the time limit for claim on the above shipment to July 5.
我们要求将上述货物的索赔时间期限延长到7月5号。
9.
5000YS COTTON CLOTH EX MUSING PLEASE EXTEND TIME LIMIT FOR INSPECTION AND CLAIM TO MAY.
木星轮运来5000码棉布,请展延检验和索赔期限至5月。
10.
The CPC s Theorists Exploration and Contribution to the Sinofication of Marxism during Yan an Period;
延安时期党的理论工作者对马克思主义中国化的探索与贡献
11.
On Ai Siqi’s Exploration and Contribution to Marxism ’s Lolalization Yanan Period;
延安时期艾思奇对马克思主义中国化的探索与贡献
12.
Time and Cost Claim for Extension of Time for Completion of International Project Under FIDIC Conditions of Contract;
FIDIC合同条件下国际承包工程的延期及其费用索赔
13.
On the Reasons of the Sinicization of Marxism by the First Generation Leading Collective of the CCP in the Yan an Period;
论延安时期党的第一代领导集体探索马克思主义中国化的原因
14.
On the CPC Theoretical Workers Exploration and Contribution to the Sinicization of Marxism during the Period of Yan an;
试论延安时期党的理论工作者对马克思主义中国化的探索与贡献
15.
Study on the Influence on Rhizoma Corydalis by Different Harvest Time and Processing Methods
不同采收期和不同加工方法对延胡索药材的影响
16.
Shaan-Gan-Ning Border’s Exploration of Harmonious Society:Take the Case of Textbooks of Yanan Period
陕甘宁边区对建设和谐性社会的探索——以延安时期教材资料为中心
17.
On Mao Zedong’s Exploration and Contribution to Marxism’s Localization in Yan’an Period
延安时期毛泽东对马克思主义中国化的探索与贡献
18.
Claim for hurry work of incomplete construction period delay under FIDIC contract conditions
FIDIC施工合同条件下不完全顺延工期赶工索赔的处理