说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 峰值速度
1.
The pixel rendering peak value rate is 260 Mpixels per second.
象素处理峰值速度为每秒2.6亿个象素.
2.
Assessment of Left Ventricular Diastolic Function by Peak Negative Myocardial Velocity Gradient in Patients With Dilated Cardiomyopath
舒张早期心肌负向峰值速度阶差评价扩张型心肌病左室舒张功能
3.
greater than 50%, further decreased systolic blood velocity provoked monophase waveform.
狭窄度>50%时,动脉远端脉冲多普勒频谱为收缩期峰值速度降低的单相波形;
4.
Max. burst length at peak rate (bytes)
峰值速率时的最大突发长度(字节)
5.
The results show that as the capacitance decreasing,the alternation between efficiency peak value and speed peak value are increased.
得出的结论为:随着电容减小,效率峰值与速度峰值的交互作用增加。
6.
The Research on The Ground Motion Peak Acceleration Distribution Related With Probability OF Earthquake Intensity
基于概率烈度的地面加速度峰值分布的分析
7.
Study on variety of blood flow velocity of common carotid artery during systole
颈总动脉收缩期峰值血流速度变异的探讨
8.
PREDICTION OF GROUND MOTION PEAK ACCELERATION OF CONSTRUCTION SITES IN QINIIUANGDAO
秦皇岛市工程场地地面运动峰值加速度预测
9.
The Influence of Epicenter Distance to Peak Ground Acceleration on Different Sites
震中距对不同类别场地峰值加速度的影响
10.
Change Law of Horizontal Peak Ground Acceleration on Different Category Site
不同类别场地水平向峰值加速度的变化规律
11.
Comparison and analysis of near fault horizontal velocity peak value's attenuation relationship
近断层水平速度峰值衰减关系的比较与分析
12.
THE INTENSITY AND PGA OF JAN. 4, 1988 LINGWU EARTHQUAKE(M_s=5.5), NINGXIA ESTIMATED BY DAMAGE OF MULTI-STORY BRICK BUILDING
由多层砖房墙体震害估计1988年灵武5.5级地震的峰值加速度和烈度
13.
Max burst length at peak rate and Max data unit size can not exceed 65535.
峰值速率的最大突发长度和最大数据单元大小不能超过 65535。
14.
"Max burst length at peak rate and Max data unit size can not exceed 65535.\0
"峰值速率的最大突发长度和最大数据单元大小不能超过 65535。\0
15.
Research on Allowable Peak Particle Vibration Velocity for Transport Adit in Blasting in Open-Pit Mine
露天爆破运输平硐允许峰值质点振动速度的研究
16.
Influence of Reentry Velocity and Reentry Angle on Peak Aerodynamic Heating Rate of Manned Spacecraf
飞船再入速度和再入角对气动加热率峰值的影响
17.
Analysis on Relationship Between 3-level Exceeding Probability(EP) and Horizontal PGA
三水准超越概率水平地震动峰值加速度关系分析
18.
The Effective Static Wind Load and the Top Acceleration Response of Liede A3# Building
猎德地块A3栋等效静力风荷载及峰值加速度响应